background image

THEORY OF OPERATION

GENERAL DESCRIPTION:

The Phantom Edge is a self monitoring wireless (RF) sensing edge system. A special
communication protocol between the transmitter and receiver allow for additional signals

3

(other than edge activation) to be sent, such as battery condition and periodic communication
checks. If the unit detects a fault it will convert the operator to supervised mode
(i.e. constant pressure contact on operator close control) indicating that maintenance
is required.

WIRING COULD CAUSE ELECTROCUTION OR DAMAGE TO CIRCUITRY

FOLLOW ALL LOCAL BUILDING CODES AND NATIONAL ELECTRICAL CODES. IMPROPER

TO PREVENT ELECTROCUTION DISCONNECT POWER AT FUSE BOX OR CIRCUIT

INSTALLATION INSTRUCTIONS

BREAKER AND OPERATOR BEFORE WIRING

2) Clean the vertical surface where the Transmitter is to be mounted on the Bottom Bar.

TRANSMITTER INSTALLATION:

NOTES:

3) Remove the protective film from the adhesive backed foam tape and attach it to the back of the
    Transmitter box. Attach the Transmitter box to Bottom Bar vertical surface with the label facing

NOTE: If your installation requires the use of mounting screws, remove the cover from transmitter,
the mounting holes are at the corners (at cover screw locations). DO NOT drill any holes in
the Transmitter box.

device is functioning properly.

the Receiver, reversing the door. The unit has self check features, which ensure that the

When the Bottom Bar encounters an obstruction, the Transmitter sends reversing signal to

OPERATION:

The unit periodically tests communication by sending a signal at regular intervals.

If any of the above occur (not occur) the unit will enter into Supervised Mode:

Low Battery Voltage condition

1) Locate position on Bottom Bar near Sensing Edge pigtail. (Approx. 18" from end of Bottom Bar)

Constant pressure will be required on close door operation until fault is corrected.

4) Connect the sensing edge pigtail to the transmitter per the detail shown on the next page.

BEFORE INSTALLING, VERIFY THAT YOU HAVE A COMPATIBLE OPERATOR.

PHANTOM EDGE SYSTEM.

OPERATOR SHOULD BE COMPLETELY WIRED AND FUNCTIONAL                 TO INSTALLING

PRIOR

    outward, not up.

Summary of Contents for Phantom Featheredge 6,225,768

Page 1: ...COOKSON OWNER S MANUAL WIRELESS SELF MONITORING SENSING EDGE SYSTEM PATENT NO 6 225 768 9046 DWG ECN 1057 10 27 09 REV 6 VERSION 6...

Page 2: ...S LOW BATTERY VOLTAGE LED INDICATOR PROGRAMMABLE RECEIVER CODES SPECIAL FEATURES ELECTRICAL CONFIG OPTIONAL N O OR N C POWER 24 VOLT AC OR DC OPERATING TEMP 25 F TO 120 F ENCLOSURE COLOR BLACK ENCLOSU...

Page 3: ...the Transmitter box Attach the Transmitter box to Bottom Bar vertical surface with the label facing NOTE If your installation requires the use of mounting screws remove the cover from transmitter the...

Page 4: ...r per operator specific wiring diagram See Appendix for Wiring Diagrams internal components of the door operator of obstructions Make sure a knock out is accessible and that mounting screws will clear...

Page 5: ...ERY SIGNAL ACQUIRED EDGE ACTIVATION NORMAL MODE LED LEGEND RECEIVER TRANSMITTER ON BOTTOM BAR RECEIVER ON OPERATOR Constant pressure required on door CLOSE control D3 Transmitter Awake GREEN LED will...

Page 6: ...Door now requires momentary contact for CLOSE control pressure required on door CLOSE control ON 1 TEST MODE ON 2 WIRE 10K TERMINATION EDGE 3 Make sure the antenna is attached to the receiver and that...

Page 7: ...blinking red LED this means that the transmitter sees a sensing edge termination fault If the edge is a 4 wire type one of the safety edge wires may not be making contact in the connector in the tran...

Page 8: ...nsmitter battery An ACTIVE SENSING EDGE to the transmitter will cause the receiver sensing edge output relay REMEMBER to stay ACTIVE ALL FAULT CONDITIONS low battery edge termination not sensed commun...

Page 9: ...class B digital device or peripheral the instructions furnished the user shall include the following or similar statement placed in a prominent location in the text of the manual equipment does cause...

Page 10: ...LIFTMASTER GH H WIRING DIAGRAM LIFTMASTER MGJ WIRING DIAGRAM FDO A FDO B WIRING DIAGRAM PRO GH H DESCRIPTION PAGE 10 LIFTMASTER MICANAN COOKSON WIRING DIAGRAM FDO A10 A 6 WIRING DIAGRAM LIFTMASTER MG...

Page 11: ...LLOW BLUE GREEN BROWN ORANGE PHANTOM EDGE RECEIVER 1 2 3 4 5 7 10 LIFTMASTER GH H L1 L2 L3 WIRE NUT FROM TRANSFORMER RED REMOVE WIRING DIAGRAM WIRE NUT FIELD INSTALLED BLACK RED YELLOW BLUE GREEN ORAN...

Page 12: ...GREEN BLACK YELLOW ORANGE BROWN BLUE PHANTOM EDGE RECEIVER 1 2 3 4 5 7 10 11 12 RED REMOVE NOT USED LIFTMASTER MGJ SINGLE PHASE WIRING DIAGRAM WIRE NUT FIELD INSTALLED RED GREEN BROWN BLUE A 2 BLACK O...

Page 13: ...BLUE ORANGE BROWN PHANTOM EDGE RECEIVER 1 2 3 4 5 7 10 LIFTMASTER MGJ 3 PHASE WIRING DIAGRAM WIRE NUT FIELD INSTALLED RED GREEN ORANGE A 3 BLACK TRANSFORMER WIRE NUT BLACK BLUE BROWN RED RED REMOVE YE...

Page 14: ...IRING DIAGRAM J9 J8 NOT USED FDO A FDO B OPERATOR 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 9 10 8 7 6 5 4 3 2 1 RECEIVER EDGE PHANTOM ORANGE GREEN BLUE YELLOW RED BROWN BLACK A 4...

Page 15: ...BLACK BLUE GREEN YELLOW ORANGE BROWN RED PHANTOM EDGE RECEIVER 1 2 3 4 5 6 7 8 9 MICANAN GH H REMOVE WIRING DIAGRAM WIRE NUT FIELD BLACK BLUE GREEN ORANGE YELLOW RED WHITE A 5 INSTALLED...

Page 16: ...EEN BLUE RECEIVER EDGE PHANTOM 1 2 3 4 5 6 10 11 A2 A1 L1 L2 YELLOW FROM TERMINAL 14 REMOVE NOT USED WALL MOUNTED CONTROL PANEL FDO A10 WIRING DIAGRAM ORANGE GREEN BLUE WIRE NUT FIELD INSTALLED RED BR...

Page 17: ...BLUE ORANGE YELLOW GREEN BLACK BROWN RECEIVER EDGE PHANTOM 1 2 3 4 4A 5 6 7 8 9 10 NOT USED WALL MOUNTED CONTROL PANEL COOKSON MG SG SERIES OPERATOR WIRING DIAGRAM GREEN BLACK RED BLUE ORANGE A 7 BRO...

Reviews: