04/02/2015
58-C0181/DGT Rev. 2 EN
46
4.1
Preventive maintenance
Next table shows the maintenance actions to be carried out on the equipment:
Action
Who
When
Check to ensure that there is no
external damage to the equipment,
which could jeopardise the safety of
use
Operator
Before every working session
Check status and functioning of the
operator's command
Operator
Before every working session
Check the inclinometer (see chapter
4.2.1)
Operator
Once a year or every time the
results are not reliable
Check the calibration with the test
anvil (see chapter 4.2.2)
Operator
Once a year or every time the
results are not reliable
General inspection
Operator
Weekly
Cleaning of the mechanical parts
(see chapter 4.3)
Authorized service
engineer
After approx. 2000 strikes
Replacement of the batteries
Authorized service
engineer
When necessary (e.g. The
maximum duration of the
battery charge decreases
drastically)
Summary of Contents for 58-C0181/DGT
Page 1: ...MANUALE DI ISTRUZIONI INSTRUCTION MANUAL 58 C0181 DGT Digital Concrete Hammer ...
Page 2: ......
Page 57: ...Manuale di Istruzioni Instruction Manual 58 C0181 DGT Rev 2 EN 04 02 2015 53 Notes ...
Page 58: ...Manuale di Istruzione Instruction Manual 04 02 2015 58 C0181 DGT Rev 2 EN 54 Notes ...
Page 59: ...Manuale di Istruzioni Instruction Manual 58 C0181 DGT Rev 2 EN 04 02 2015 55 Notes ...
Page 60: ...Manuale di Istruzione Instruction Manual 04 02 2015 58 C0181 DGT Rev 2 EN 56 Notes ...