4.7 Setting Profibus Slave Parameters ..................................................................... 35
APPENDIX A. PROFIBUS INSTALLATION GUIDELINES .................................37
General Installation Information ................................................................................ 37
Maximum number of stations
37
Cable Type
37
Cable Lengths
37
Bus termination
38
Bus connectors and PROFIBUS-DP/FMS interface
38
Cable laying guidelines.............................................................................................. 40
Laying of copper cable
40
Laying cables within control cabinets
41
Laying cables outside of control cabinets
42
SPECIFICATIONS .................................................................................................43
General ...................................................................................................................... 43
Ports ........................................................................................................................... 43
Environmental ............................................................................................................ 43
LIMITED PRODUCT WARRANTY ........................................................................45
REPAIR POLICY ...................................................................................................46
Summary of Contents for 2500 Series
Page 8: ......
Page 35: ...CTI 2500 RBC Installation and Operation Guide V1 6 29 ...