3. Set-up, operation and shut-down.
3.1. Preparation for operation.
1.
Ensure that compressor is positioned out of the abrasive blasting operation zone on
downwind side.
2.
Start compressor and increase pressure and temperature up to operational values.
3.
Open lower ball valve at machine compressed air line (the handle of the open valve
should be parallel to the compressed air line).
4.
Open the tank venting ball valve.
5.
Close compressed air feed ball valve (upper ball valve on the compressed air line).
6.
Close metering valve FSV by setting adjusting handle in the central position.
7.
Connect compressed air hose to coupling of the machine. Compressed air hose
diameter should be at least 1.25”. Lock hose coupling with a safety clip or wire.
8.
Connect abrasive blasting hose to hose coupling of the machine. Lock hose coupling
with a safety clip or wire.
9.
Fill the machine tank with abrasive.
10. Put protective equipment on.
Summary of Contents for DBS-100
Page 4: ...4 CONTRACOR Version 2 0 ENGLISH 2 General view...
Page 11: ...11 CONTRACOR DBS Art 10100 10200 ENGLISH Fig 5 1...
Page 20: ...DEUTSCH 20 CONTRACOR Version 2 0 2 Ansicht Arbeitsaufbau...
Page 27: ...DEUTSCH 27 CONTRACOR DBS Art 10100 10200 Abb 5 1...
Page 35: ...35 CONTRACOR DBS Art 10100 10200 1 37 2 38 3 40 4 42 5 44 6 46...
Page 36: ...36 CONTRACOR 2 0 1 1 2 3 4 5 6...
Page 37: ...37 CONTRACOR DBS Art 10100 10200 2...
Page 39: ...39 CONTRACOR DBS Art 10100 10200 3 3 1 1 2 3 4 5 6 FSV 7 1 25 8 9 10...
Page 40: ...40 CONTRACOR 2 0 3 2 1 12 2 3 4 FSV 5 3 3 1 2...
Page 41: ...41 CONTRACOR DBS Art 10100 10200 4 4 1 4 2...
Page 42: ...42 CONTRACOR 2 0...
Page 44: ...44 CONTRACOR 2 0 5 1...
Page 45: ...45 CONTRACOR DBS Art 10100 10200 6 1 CONTRACOR 12 2 3 4 5 6 7 8 9...