
3-10
IO-240 Series Engine Installation & Operation Manual
31 October 2011
Engine Installation
normal service to ensure the installed engine meets the manufacturer’s performance and
operational specifications.
WARNING
The fuel system must be adjusted after installation in the
airframe according to the “Engine Operational Check”
instructions in Section 6-3.7 of the Maintenance and Overhaul
Manual (M-6) to ensure proper operation. Correct all
discrepancies prior to release for flight.
IO-240 engines are neither designed, nor approved, for
continuous negative or zero “G” operation. Engine Mount
loads shall not exceed FAR 23 utility category load factors.
CAUTION: Check the oil level in the sump and service, if necessary
to the capacity specified in Section 2-3, “Engine Specifications and
Operating Limits” with oil meeting the SAE specification described
in “Engine Oil Specifications” in Section 3-2.1 of the Maintenance
and Overhaul Manual (M-6). Pressure check the fuel system for
leaks before starting the engine.
NOTE: Perform a flight check according to instructions in Section 4-2.3.2
before releasing the engine for normal operations. New and rebuilt
engines, and engine with one or more new cylinders or pistons, require a
25-hour break-in. After installation, avoid prolonged ground operation at
high power.
1Procedure
1. Perform an “Engine Operational Check” instructions in Section 6-3.7 of the
Maintenance and Overhaul Manual (M-2).
2. Perform a “Flight Check” according to instructions in Section 4-2.3.2.
Summary of Contents for IO-240-A
Page 145: ......
Page 146: ...www continentalmotors aero ...