3-8
IO-240 Series Engine Installation & Operation Manual
31 October 2011
Engine Installation
8. Install the rocker covers with new gaskets according to the “Rocker Arm
Installation” instructions in Section 17-4.3 of the Maintenance and Overhaul
Manual (M-2). Torque the rocker cover fasteners to Appendix B specifications.
9. Disconnect the pre-oiler supply hose and cap; connect the airframe oil pressure
sensor to the engine oil pressure output according to the airframe manufacturer's
instructions.
WARNING
Do not operate the engine unless the oil is properly serviced.
10. Check the oil level in the sump using the oil gauge rod (dip stick). Verify the engine
oil is at the proper level according to “Engine Oil Servicing” instructions in Section
6-3.7.1 of the Maintenance and Overhaul Manual (M-6).
3-2.3.1.2. Engine Preoiling Method 2
1. Service the engine oil level (See “Engine Oil Servicing” instructions in Section 6-
3.7.1 of the Maintenance and Overhaul Manual (M-6)).
CAUTION: If the engine oil cooler adapter is connected to an
airframe mounted oil cooler, the oil cooler and hoses will contain
trapped air that oil servicing will not evacuate from the engine
lubrication system. Failure to purge the air from the oil cooler and
hoses prior to engine start will damage the engine.
2. Turn the fuel selector valve to the OFF position.
3. Position the mixture control to the IDLE/CUTOFF position and ensure the magneto
switch(es) are in the OFF position.
WARNING
Do not continuously operate the starter for more than 30
seconds.
4. Engage the starter for no longer than 30 seconds or until oil pressure is indicated on
the oil pressure gage. After 30 seconds, allow 3 to 5 minutes to allow the starter to
cool before engaging the starter again. If no oil pressure is indicated after three 30
second engage/cooling intervals, check connections and gauge operation.
5. Install and torque the spark plugs and ignition lead wires according to the “Spark
Plug Maintenance” instructions in Section 6-3.9.2 and “Ignition Harness
Maintenance” instructions in Section 6-3.9.3 of the Maintenance and Overhaul
Manual (M-6).
3-2.3.2. Fuel Purge and Leak Check
Prior to shipping from the factory, the fuel injection system was preserved with MIL-PRF-
6081D Grade 1010. The preservative fluid was drained during completion of Section 3-
2.2. Flushing the system with aircraft fuel will complete the purge and prime the fuel
injection system for operation.
1. Disconnect the fuel supply at the inlet to the fuel manifold valve.
Summary of Contents for IO-240-A
Page 145: ......
Page 146: ...www continentalmotors aero ...