W415-1112 / 06.12.12
27
RIgHT HAND RA pANEL
LEFT HAND RA pANEL
STEp #14
○ fasten bottom front cover to corner posts using hex head wildrill screws. assemble burner, flange adapt-
er, and gaskets to oil furnace mounting flange bolts as per diagram.
○ attach oil furnace sight glass, gasket, and bracket to bottom front panel using (2) hex screws.
NOTE
not all oil burner module kits require adapter collar and second fibre gasket.
Check "manual" addendum accompanying oil furnace module for specific assembly details.
oil burner
oil burner
mounTinG
flanGe
braSS nuTS
fibre
GaSkeTS
adaPTer
Collar
oil furnaCe
flanGe
boTTom fronT
Cover
LEFT HAND RA CONFIg SHOWN
SiGHT GlaSS braCkeT
GaSkeT
SiGHT GlaSS
FLANGE GASKET
A
A
SECTION A-A
SCALE 1 : 16
FURNACE BOTTOM
OIL FURNACE
COMBUSTION CHAMBER
FIREBOx
FRONT
ALL 115v ELECTRICAL pRE ASSEMBLED HARNESSES MUST BE INSTALLED AS pER
INSTRUCTIONS.
NO 115v ELECTRIC CIRCUIT HARNESS OR FIELD WIRINg MAY pASS THROUgH CLEARANCE
SpACE BETWEEN CHMF150/200 FURNACE BOTTOM AND FLOOR.
FAILURE TO COMpLY MAY RESULT IN ELECTRIC SHOCk, FIRE, pROpERTY DAMAgE OR
pERSONAL INjURY.
○ locate flange gasket over bolts of oil furnace mounting flange, prior to placing
bottom front cover up to mounting flange.
○ align mounting bolts on flange align with clearance holes in bottom front panel
when panel loosely fit in final position.
○ Correct position of bottom front panel has top flange of panel over top of firebox
front flange and underneath furnace bottom.
○ new bottom front panels in oil furnace module kits.
OIL FURNACE
FLUE