4.2.2 VERTICAL INSTALLATION
This application occurs when venting through a roof. Installation kits for
various roof pitches are available from your authorized dealer / distributor. See
accessories to order speci
fi
c kits required.
A.
Determine the air terminal location, cut and frame a square opening as
illustrated in the ceiling and the roof to provide the minimum 1“ (25mm)
clearance between the vent pipe and any combustible material. Try to center
the vent pipe location midway between two joists to prevent having to cut
them. Use a plumb bob to line up the center of the openings. A vent pipe
shield will prevent any materials such as insulation, from
fi
lling up the 1”
(25mm) air space around the pipe. Nail headers between the joist for
extra support.
B.
Apply a bead of caulking (not supplied) to the framework or to the Wolf
Steel vent pipe shield plate or equivalent (in the case of a
fi
nished ceiling),
and secure over the opening in the ceiling. A
fi
restop must be placed on the
bottom of each framed opening in a roof or ceiling that the venting system passes
through. Apply a bead of caulking all around and place a
fi
restop spacer over
the vent shield to restrict cold air from being drawn into the room or around the
fi
replace. Ensure that both spacer and shield maintain the required clearance to
combustibles. Once the vent pipe is installed in its
fi
nal position, apply sealant between the
pipe and the
fi
restop assembly.
C.
In the attic, slide the vent pipe collar down to cover up the open end of the shield and
tighten. This will prevent any materials, such as insulation, from
fi
lling up the 1” (25mm) air
space around the pipe.
21.1
CAULKING
VENT PIPE
SHIELD
FIRESTOP
UNDERSIDE OF
JOIST
VENT
PIPE
COLLAR
VENT
PIPE
SHIELD
A.
Stretch the inner
fl
ex pipe to the required length
taking into account the additional length needed for
the
fi
nished wall surface. Apply a heavy bead of the
high temperature sealant W573-0007 Mill Pac (not
supplied) to the inner sleeve of the air terminal. Slip
the vent pipe a minimum of 2” (50.8mm) over the inner
sleeve of the air terminal and secure with 3 #8 screws.
B.
Using the outer rigid pipe, slide over the outer combustion air
sleeve of the air terminal and secure with 3 #8 screws. Seal
using high temperature sealant W573-0002 (not supplied).
C.
Insert the vent pipes through the
fi
restop maintaining the required clearance to combustibles. Holding the air
terminal (lettering in an upright, readable position), secure to the exterior wall and make weather tight by sealing
with caulking (not supplied).
D.
From inside the house, using silicone, seal between the vent
pipe and the
fi
restop. Then slide the black trim collar over the
vent pipe up to the
fi
restop.
E.
If more vent pipe needs to be used to reach the appliance,
couple them together as illustrated. The vent system must
be supported approximately every 3 feet (0.9m) for both
vertical and horizontal runs. Use noncombustible strapping
to maintain the minimum clearance to combustibles.
The air terminal mounting plate may be recessed into the exterior wall or siding no greater than the depth of its
return fl ange.
23.7C
SCREWS
#10x2"
SEALANT
HIGH TEMP
2" (50.8mm) OVERLAP
CAULKING
7" (177.8mm) RIGID
PIPE
4" (101.6mm) FLEX PIPE
#8 X 1/2”SELF DRILLING
SCREWS & WASHERS
INNER COUPLER
HI-TEMP
SEALANT
OUTER
RIGID PIPE
INNER
FLEX PIPE
OUTER
RIGID PIPE
4.2.3 HORIZONTAL AIR TERMINAL INSTALLATION - MODEL CDVSS280
9" (288.6mm)
Summary of Contents for CDVS280N
Page 49: ...W415 1429 01 06 15 49 EN 16 0 SERVICE HISTORY 43 1...
Page 50: ...W415 1429 01 06 15 50 EN 44 1 17 0 NOTES...
Page 51: ...W415 1429 01 06 15 51 EN 44 1...
Page 102: ...FR 44 1 16 0 NOTES 102 W415 1429 01 06 15...
Page 103: ...FR 44 1 103 W415 1429 01 06 15...
Page 104: ...44 1...