Description of Functions
3-15
3.7
The boot process
During the boot process, all services and programs required are started
automatically.
This process will take approx. 2 minutes.
Starting the boot process:
States of the LEDs:
ACTIVE MODEM:
off
ACTIVE ETHERNET:
off
ERROR:
off
POWER:
green
The settings are loaded.
States of the LEDs:
ACTIVE MODEM:
off
ACTIVE ETHERNET:
off
ERROR:
red
POWER:
green
A check is carried out to see whether the ETHERNET connection can
be addressed.
States of the LEDs:
ACTIVE MODEM:
off
ACTIVE ETHERNET:
red
ERROR:
red
POWER:
green
All relevant services, such as firewall and routing, are initialised. The
configuration of the ETHERNET connection is finished.
States of the LEDs:
ACTIVE MODEM:
off
ACTIVE ETHERNET:
green
ERROR:
red
POWER:
green
The boot phase is now completed; the router is ready for operation.
States of the LEDs:
ACTIVE MODEM:
off
ACTIVE ETHERNET:
green
ERROR:
green
POWER:
green