
28
one module, since all modules are metallically intercon-
nected.
6�9 Insulation installation
NOTE:
The connection pipes are not shown in the following!
Securing discs for insulation jacket
Screw a hook on both sides of the two end modules. Secure
the discs after mounting the insulation jacket to avoid gaps
appearing during fitting.
Screw securing discs with M6 bolt to corresponding hole
D6, so that it is still rotatable.
Convection control
Install convection brakes on each store module at the same
evenly to the sealing surfaces on the inside of the store and
on the sheet metal bore radially. Insert the module seal.
Through the hole, grasp the gasket inside (1) all around
and manover to the center of the hole.
The manovering (1) ensures that the inner sealing lip (2) of
the seal rests correctly on the container steel everywhere.
Then the seal inside and outside must have a uniform
circular curve, otherwise repeat the process.
6�8 Connection to the heating system,
Equipotential bonding
Connect the heating system to the store and fill. Please note
the instructions in Chapter 3 planning assistance, to remove
air from the store and the whole system. Check connections
for leaks.
Equipotential bonding by grounding a suitable position of
the container - for example the feet. It is sufficient to ground
T D M A - VA R I C A L :
Assembly instructions