Conquip Trench Box User Manual Download Page 11

Important Notes

• 

This User Guide is for this Conquip product only.

• 

Any movements of the product must be thoroughly planned before the work commences to identify 

potential hazards and assess risk.

• 

All personnel involved in lifting and transportation of this product must have read this User Guide and 

must be properly briefed.

• 

You must be competent, alert and medically fit when using this equipment. If you have a medical 

condition, a mental or physical disability, you must seek advice from a medical professional before using 

this equipment.

Talking to us is easy

We’re here to help

Call us on 0800 116 076

Email us at [email protected]

www.cqegroup.co.nz

Copyright © 2021 Conquip Engineering Group. All Rights Reserved.

 

Trench Box  - Issue 4

Summary of Contents for Trench Box

Page 1: ...User Guide Trench Box...

Page 2: ...nto place The Trench Box is normally selected for installing utility pipes where ground movement is not critical The size of the system required depends on maximum trench depth requirements and the si...

Page 3: ...External Length Internal Length TL101 00003 2560mm 3500mm 3100mm TL101 00004 1310mm 3500mm 3100mm 1 Weight will be equal to or less than the weight stated depending on your strut configuration Produc...

Page 4: ...Parts Diagram Trench Extension Box NOTE These parts are for this model they may differ for previous versions Please contact Conquip with any queries NOTE These parts are for this model they may diffe...

Page 5: ...nd secure with 40mm pins and R clips 4 Lower the pre assembled struts onto the rocker assemblies securing the struts to the panel brackets using pins and R clips 5 Connect the 4 remaining rocker assem...

Page 6: ...ox into the Trench 3 The excavator operator digs progressively between the two faces of the box panels 4 The rocker assemblies allow vertical and horizontal movement when the force from the bucket is...

Page 7: ...tension box 2 Attach a certified lifting chain to one of the top lifting points on the extension box 3 Slowly lift the corner of the extension box 4 Repeat this process for each lifting point in turn...

Page 8: ...he top lifting points of the extension box and lowering it on its side 13 Remove the R clips pins and the connectors from the base box 14 Backfill the trench and extract the base box using the same me...

Page 9: ...ce Do not operate this equipment near overhead power lines Take care in confined spaces near ceilings or similar hazards This equipment was designed for vertical lifting Do not drag or swing Before op...

Page 10: ...tions involving drilling welding cutting or distortion of materials in any form are to be carried out on the product Conquip Engineering Group must provide full written approval prior to the work bein...

Page 11: ...ave read this User Guide and must be properly briefed You must be competent alert and medically fit when using this equipment If you have a medical condition a mental or physical disability you must s...

Reviews: