Testing the Meter Installation and Sealing the Device 

 

To test the installation: 
  

1.  Ensure that the Meter is correctly installed. 

2.  Apply power to the meter by closing the upstream breaker.   

3.  Check that the meter is displaying the available credit in kWh. If a zero balance is 

displayed, a credit token needs to be purchased and entered into the meter using the 
keypad. 

4.  Enter 

#100#

 on the keypad to view the meter serial number. 

5.  Compare the meter number displayed to the serial number printed on the meter label 

and card, to confirm that the numbers match. 

6.  Turn on an appliance or light in the consumer's premises, to ensure that the consumer 

has electricity. In some cases, meter commissioning may be required. For more 
information, see the 

Commissioning the meter

 section 

7.  If the meter is working correctly, hand over the meter card and user guide to the 

consumer. 

 

Cabling Specifications 

 

Cable  Size 

Live wire  Max 16mm

2

 

Neutral wire  Max 16mm

2

 

Type  Copper  

Wire insertion depth into terminal block  12mm 

Wire to be stripped with at least 12mm of 

conductor contracting the terminals 

Securing torque (cable onto terminal block)  2Nm 

 
 
 

 

Summary of Contents for BEC21

Page 1: ......

Page 2: ...afety Information 3 Safety and Maintenance Instructions 4 Installation 5 Diagrams and Illustrations 5 Procedure 6 Testing the Meter Installation and Sealing the Device 7 Cabling Specifications 7 Displ...

Page 3: ...ical Contractor No responsibility is assumed by Conlog Pty Ltd for any consequences arising out of the use of this material An installation electrician or electrical contractor is one who has skills a...

Page 4: ...ls are used for the installation Ensure that the meter is installed in a dry location and is not exposed to water or moisture No sharp objects to be used to press the keypad If keypad is damaged pleas...

Page 5: ...iagrams and Illustrations Figure 2 Terminal Cover Remove terminal screw before mounting the meter and insert the terminal screw on to the terminal cover Figure 1 Product Layout Figure 3 Terminals Figu...

Page 6: ...ve supply to L LINE Figure 3 7 Connect the incoming neutral supply to N LINE Figure 3 8 Connect the outgoing live supply to L LOAD Figure 3 9 Connect the outgoing neutral supply to N LOAD Figure 3 10...

Page 7: ...to the serial number printed on the meter label and card to confirm that the numbers match 6 Turn on an appliance or light in the consumer s premises to ensure that the consumer has electricity In so...

Page 8: ...alised contact Conlog E02 Meter not calibrated contact Conlog E03 Internal error contact Conlog E04 No supply voltage present E05 Reserved for future use E06 Reserved for future use E07 Communication...

Page 9: ...it Status LED Rate LED 1000 imp kWh Terminals Layout Live Neutral Neutral Load Type Cage clamp Maximum size 16mm Interrogation Type Near Field Communication NFC Compliance Standards IEC 62052 11 IEC 6...

Reviews: