3.10.1 – AUTOMATIC COMMISSIONING
Only possible if at least one of the limitations (opening/closure) is set as the “torque” or “in the automatic position”.
Press the start button for 3 sec.
For the position of the start button see
1
During the commissioning phase (green light flashing, the
valve is moving in both the limit positions)
2
3
Fixed green light – The valve has successfully
started and is ready to enter in operation
3.10.2 – MANUAL COMMISSIONING
1
2
Connect the PSCS-USB cable to the PC and start the
software
Select the type of actuator and the program interface
3
4
Select “Operate” Commissioning
and confirm with OK
During manual commissioning, ensure the correct value for
the closure position or binary input to control the valve in
the closure position based on the configuration established
is permanently applied.