G
D
I
C
F
E
B
A
H
2
Stand up both side
panels [A]. Insert
panel brace [B] into
opening located on
[A] then push down
to lock in place.
Step 1
Attach one of the
panel extensions [D]
to part [A] by sliding
in from the side until
flush. Repeat to
attach the second
part [D].
Step 2
With the thin edge
of the curved riser
[C] facing down-
ward align the
lower tabs with the
openings on part
[A] and push in.
Step 3
While holding lower
tabs in part [A] align
the top tabs then
tap down with a
rubber mallet until
flush.
Step 4
Confer Plastics “CURVE” Above Ground Pool Step
can be assembled with the treads curved inward or curved
outward. Determine which direction you want the steps before starting assembly.
The CURVE Step requires 40 lbs. of sand to complete assembly. The Curve Step with optional add-on requires a
total of 70 lbs. of sand. Choose a location close to the swimming pool for assembly. If you have a pool deck it is
recommended to build the step on top of the deck to avoid lifting completed step over the pool wall.
Hardware Pack
4 - Plugs (wg)
8 - #10 x 1-1/4" screws
2 - Labels-No Jumping/Diving
Needed for Assembly
- Rubber mallet
- Funnel
- Cordless Drill
- Phillips screwdriver
- Liquid soap or lubricant
- Sand - 40 lbs. for (Curve Step)
- 70 lbs. for (Curve System)
Model# CCX-AG
-
CURVE ABOVE GROUND POOL STEP
ASSEMBLY INSTRUCTIONS - PLEASE READ BEFORE ATTEMPTING ASSEMBLY
Parts List
2 - Side panels [part A]
1 - Panel brace [part B]
4 - Curved risers [part C]
2 - Panel extensions [part D]
4 - Handrail posts [part E]
2 - Deck connectors [part F]
2 - Handrails [part G]
4 - Foot pads [part H]
4 - Treads [part I]
If missing parts call - Toll free U.S. - 800-635-3213 or www.Conferplastics.com
prpd.Confer-CurveStepAG-USr11:Confer-Step-1_R1 2/19/13 2:55 PM Page 2