Switchboard
Always keep the switchboard door closed. Any work on the meter box or its supply cables must only be carried out
by a licensed electrician or personnel authorised by your electricity supplier.
Cables and plugs
One of the most common causes of system breakdown is damage to the solar cables. If you come across a
damaged cable or any other system defect, please report it to your SunEasy Power system installer so that it can
be repaired.
3. System Operation
Your Conergy SunEasy solar power system meets all Australian standards and regulations current at the time of
installation. All necessary quality-control and safety measures have been observed to guarantee safe and trouble-
free operation.
The day to day operation of your solar power system is automatic, meaning you don’t have to switch it on or off or
monitor it during the day.
We recommend that you check the meter and inverter once a fortnight as follows:
Meter: Check it during the day when there are no (or minimal) electrical appliances operating in your house. The
meter should be showing energy exported.
3.1 To Check Systems with the Conergy WR Inverter
Inverter: Check the LED light on the front of the inverter:
LED Status
Indication
Steady Green
Solar System Operational - Normal Condition.
Flashing Green
Solar System Operational – Error Message displayed on the LCD Screen. (see
Status Diagnosis and Repair” on page 55 of the WR Inverter Instruction Manual
for the Error Message).
Steady Orange
The inverter is in
automatic start-up phase – Normal everyday condition after
sunrise.
Flashing Orange
Warning displayed on the screen or Manual shutoff of the system operation.
Inverter will automatically start-up operation after sunrise.
Steady Red
General Alarm - (see “Status Diagnosis and Repair” on page 55 of the WR
Inverter Instruction Manual for the Error Message).
Off
No Solar Array power output. This is normal during night time.