Conergy SunEasy 1000 User Manual Download Page 22

Conergy Pty Ltd, ACN 57 112 387 569; (“Conergy”) has the highest quality standards for its products. They are manufactured according to 
stringent quality regulations. This allows us to offer the warranties below to customers purchasing the following solar modules:  

1.  Conergy C 123 P
2.  Conergy C 175 M
3.  Conergy C 125 PI
4.  Conergy  C 167 P
5.  Conergy S 170 M
6.  Conergy S 175 M

1. Limited Product Warranty

Conergy warrants the module to be free from defects in workmanship and materials under normal application, use and installation, and service 
conditions for two (2) years from the date of sale to the original user / purchaser. If the module malfunctions or becomes inoperable due to a 
defect in workmanship or material during the two year period of this warranty, Conergy will, at its option, either repair or replace the module. This 
warranty transfers from the original user / purchaser to subsequent user / purchaser, but is void if the module is moved from its originally installed 
location.

. Limited Warranty on Power Output

a) Conergy warrants that any module provides not less than 90% of the minimum performance (referred to as the lower tolerance value) for a 
duration of ten (10) years as of shipment from the plant and not less than 80% of the lower tolerance value for a duration of twenty-five (25) years 
as of delivery from the plant. The performance warranty shall only apply if the modules concerned show no further defects other than the loss of 
performance and if the loss of performance lies within the sphere of responsibility of Conergy.
b) The power output must have been assessed at Standard Test Conditions (irradiance 1,000 W/m2, air mass 1.5 AM and cell temperature of 25 
°C) in an authorised testing process conducted by a testing body authorised by Conergy.
c) The aforementioned solar modules are supplied with a performance tolerance of +/- 5 %.

3. Exclusion and limitation of liability

a) If in Conergy’s sole judgment, the module has been subject to misuse, neglect, or accident or has been damaged through abuse, alteration, 
improper installation or application, or negligence in use, transportation, handling or storage, or repaired by anyone other than an authorised 
representative of Conergy, this warranty will be considered void. 
b) The warranty does not include any transportation cost for returns of modules or for costs associated with removal, installation or reinstallation 
of repaired or replaced modules.
c) The warranty does neither include material flaws, processing and production errors or functional disturbances or other damage to connection 
cables.
d) The warranty does not include indirect damage, in particular no secondary or resulting damages including damage to persons or property, lost 
profit, damage to reputation, loss of data, advertising or manufacturing costs, overhead costs and loss of customers as well as costs resulting 
from business interruption, removal and / or re-installation or purchasing of new items.
e) The prerequisite for the specified services being granted is that the module concerned has been used correctly. This is only the case where it 
has been used in a stationary application on the mainland. The guarantee does not cover maritime or mobile uses in particular. 
f) No warrantee services will be performed, if the module is modified from its delivery condition as a result of neglect, improper operation, 
installation, use, storage, transport, handling or by failure to observe the warnings in the data sheet or similar documents, the base on which 
the module is secured, connections to modules by other manufacturers, and events which could not have been prevented with the technology 
available at the time of purchase, or in any other way, even by repair. No warrantee service will be performed if the module is modified / damaged 
as a result of force majeure (storm, hail, fire, power failure, lightning strike, flooding, infestation with insects and pests, exhaust fumes etc.) and as 
a result of vandalism or comparable causes resulting from the actions of third parties. Warrantee services are also excluded if a module has been 
damaged through misuse, accident or conversion or has been repaired by a third party dealer/engineer not authorised by Conergy. Establishment 
of the existence of the above-mentioned prerequisites lies within the discretion of Conergy.
g) If the originally supplied module type is no longer produced, Conergy will supply the current nearest equivalent module type as replacement.
h) Conergy’s liability will in no event exceed the purchase price of the modules.
i) Conergy provides no explicit or implied warranties apart from those expressly made herein. 

4. General information

a) The warranty does not extend to supplying new or as-new products. Conergy retains the right to use new, overhauled or specially manufactured 
parts or products. Each module replaced becomes the property of Conergy. 
b) Claims granted on the warranty cause neither a new warranty period to be started nor the warranty to be extended. 
c) Should these terms of warranty differ from the information supplied in the data sheet, these terms of warranty shall prevail. 

5. Warranty claim Procedure

a) Claims under this warranty will be considered if submitted in writing to Conergy Pty Ltd, PO Box 909, Strawberry Hllls NSW 2012 within 14 
days following the discovery of any defect covered by this warranty, with specific details, and provided Conergy or its agents are permitted a 
commercially reasonable opportunity to examine and analyze the material or workmanship claimed to be defective. An authorised representative 
of Conergy must approve any claim in writing.
b) For a claim to be made, the original dealer invoice and this warranty certificate should be sent to Conergy or the dealer with details of the 
module type, the module serial number, the date of delivery and the defects which have arisen. 
c) The customer is entitled to return modules only with prior permission from Conergy.  

Conergy Pty Ltd
Issued: March 2007

LIMITED PRODUCT AND POWER OUTPUT 
WARRANTY FOR SOLAR MODULES

Summary of Contents for SunEasy 1000

Page 1: ...SunEasy User Manual Grid Connect Solar Power System www conergy com au ...

Page 2: ... 3 2 To Check Systems with the SMA Sunny Boy Inverter 10 3 2 1 Operating Mode Indication 10 3 2 2 Normal Operating Mode 10 3 2 3 Description of Operating Mode 10 4 System Maintenance 12 4 1 Maintenance Timetable 12 4 2 Trouble Shooting 12 5 System Drawings 13 6 Safe Operating Induction Certificate 14 7 Where to get help 15 8 Maintenance Checklists 16 Conergy Pty Ltd General Terms and Conditions fo...

Page 3: ...f use and ease of installation These kits have been designed to meet the requirements of the current Australian electrical and building codes including wind loading requirements Now that your system has been commissioned it should operate automatically Should you wish to know more about your system please read this manual and make yourself familiar with all safety requirements Observing all safety...

Page 4: ... the photons hit the silicon surface in the solar cells they generate electricity by transferring energy and freeing electrons In this way electricity is generated Put simply photovoltaic cells are energy converters converting the energy from sunlight into electricity Solar modules usually contain multiple number of solar cells encased in a durable casing Toughened glass is used to cover and prote...

Page 5: ...ely 5 Daily Energy Yield kWh Kit Sydney Melbourne Brisbane Perth Adelaide SunEasy 1000 4 02 4 03 4 04 4 82 4 40 Sun Easy 1500 6 02 6 05 6 06 7 22 6 59 Sun Easy 2000 8 03 8 06 8 08 9 63 8 79 Kit Alice Springs Canberra Darwin Auckland Wellington SunEasy 1000 4 33 4 16 3 84 3 88 3 56 SunEasy 1500 6 50 6 24 5 75 5 81 5 33 SunEasy 2000 8 66 8 32 7 67 7 75 7 11 Item Item Description 7 Array DC cables 8 ...

Page 6: ...orking in the vicinity of the installed solar module area when raining or when the area is still wet The installed solar power system generates electricity when exposed to the sun The generated voltage is dangerous and can be fatal The whole surface must be covered by black sheets prior to working on the system in order to ensure that no electricity is being generated Observe all safety signs inst...

Page 7: ...e solar modules In daylight hours as well as at dusk and dawn DC voltage will be present in the connected wires and cables Safe work on roofs After shutting down your system in the order above if persons are working on your roof you must make them aware that there is the possibility of a small non lethal electrical charge being present in the base frame and module frames Cleaning the solar array D...

Page 8: ...ls Operating instructions Please refer to the enclosed operating instructions for further safety information on your inverter and instructions for displaying your system performance data Warning notices Safety Signs and Instructions All safety instructions and warning signs installed with the system Must be kept in a legible condition Must not be damaged Must not be removed Must not be covered pas...

Page 9: ...y We recommend that you check the meter and inverter once a fortnight as follows Meter Check it during the day when there are no or minimal electrical appliances operating in your house The meter should be showing energy exported 3 1 To Check Systems with the Conergy WR Inverter Inverter Check the LED light on the front of the inverter LED Status Indication Steady Green Solar System Operational No...

Page 10: ...LED is blinking the Sunny Boy is in its normal operating status If all three LEDs are on the inverter is in its initialization phase which is a normal operating state as well All other signals indicate a disturbed operating state Refer to the inverter manual for more information on the different LED signal codes 3 2 3 Description of Operating Mode Standby at Night Initialisation If all LEDs are of...

Page 11: ...s rectified Green LED is on Green LED blinks 3 times per second Insulation Failure Green LED blinks once per second Red LED is permanently on With this signal the Sunny Boy indicates a grid failure which can be caused by Grid under voltage Grid over voltage Grid under frequency Grid over frequency First find out whether there is a general power shutdown If you do not find any failure the grid conn...

Page 12: ...t difference to your bill If you have not had your solar power system for the full quarter it may not have generated enough energy to make a significant difference to your bill If none of the above explains the difference and you are still concerned call your Conergy SunEasy system installer and ask for assistance to test the inverter and find out how much energy you have generated Then if require...

Page 13: ...ARGE AREA MODULES 9 CONERGY LARGE AREA MODULES Q3 20A 2P 400 VDC RATED ROOFTOP ARRAY ISOLATION NOT INCLUDED Q2 20A 2P 400 VDC RATED PV ARRAY MAIN SWITCH Q1 16A 1P 6KA C GRID DISCONNECTION INVERTER WR 1700 INVERTER WR 1700 Q3 20A 2P 400 VDC RATED ROOFTOP ARRAY ISOLATION NOT INCLUDED Q2 20A 2P 400 VDC RATED PV ARRAY MAIN SWITCH Q1 16A 1P 6KA C GRID DISCONNECTION 12 CONERGY LARGE AREA MODULES ...

Page 14: ...ch liability is incapable of being excluded or limited under any federal or state laws of Australia for any damages costs claims demands actions or other liability in respect of or arising from any injury death or from any loss of or damage to any property whether or not involving negligence or any other cause of action whatsoever caused or arising out of or incidental to or connected in any way w...

Page 15: ...roof of purchase should you wish to claim against the manufacturer warranty Installer Name License No Contact Phone No Fax No Email Address Street Address Supplier Name Contact Phone No Fax No Email Address Street Address Conergy Contact Phone No 1300 551 303 Fax No 02 8507 2220 Email Address support conergy com au Street Address Unit 6 44 48 O Dea Avenue Waterloo NSW 2017 ...

Page 16: ...o faults present Bypass diodes verified Array frame securely fixed to roof Array clamps and fastenings tight and secure No corrosion on mounting frame or roof Roof penetrations weatherproof Electrical connections secure Voc and Isc readings consistent with time of day and weather All Voc readings within 5 of each other Verify integrity of fuses circuit breakers residual current devices Inverter st...

Page 17: ...if installed tested no faults present Bypass diodes verified Array frame securely fixed to roof Array clamps and fastenings tight and secure No corrosion on mounting frame or roof Roof penetrations weatherproof Electrical connections secure Voc and Isc readings consistent with time of day and weather All Voc readings within 5 of each other Verify integrity of fuses circuit breakers residual curren...

Page 18: ...ee of corrosion Data logger if installed tested no faults present Bypass diodes verified Array frame securely fixed to roof Array clamps and fastenings tight and secure No corrosion on mounting frame or roof Roof penetrations weatherproof Electrical connections secure Voc and Isc readings consistent with time of day and weather All Voc readings within 5 of each other Verify integrity of fuses circ...

Page 19: ...older debts even if otherwise stated in the Purchaser s terms and conditions Conergy will inform the Purchaser about any such set off In the event that the Purchaser has already incurred costs and interest Conergy will be entitled to set off the payment first with costs then with any applicable interest and finally with the principal performance 3 7 The Purchaser will not cancel or amend any Order...

Page 20: ...usage or otherwise including any implied condition warranty term or representation as to the use of the Products their weight dimensions capacities colours or the correspondence of the Products with any contract description or as to merchantable quality fitness for any purpose or safety of the Products or operating performance where such performance is conditional on empirical factors or on the wh...

Page 21: ...ers some form of insolvency administration all sums then owing by the Purchaser to Conergy in relation to the Products or in relation to other goods supplied or Services performed by Conergy will become immediately due and payable and Conergy may without prejudice to any of its other rights recover and resell the Products and any other goods supplied by Conergy and may for that purpose enter upon ...

Page 22: ...ion or purchasing of new items e The prerequisite for the specified services being granted is that the module concerned has been used correctly This is only the case where it has been used in a stationary application on the mainland The guarantee does not cover maritime or mobile uses in particular f No warrantee services will be performed if the module is modified from its delivery condition as a...

Page 23: ...Notes ...

Page 24: ...For more information please contact us 1300 551 303 cost of local call Conergy Pty Ltd Unit 6 44 48 O Dea Avenue Waterloo NSW 2017 Email sales conergy com au Fax 61 0 2 8507 2220 www conergy com au ...

Reviews: