Installation guide for
work
IT
desk
interactive table
for
®
BrightLink
Pro
Designed for
[email protected]
www.conenmounts.com
Page 1: ...Installation guide for workITdesk interactive table for BrightLink Pro Designed for BrightLink Pro...
Page 2: ...ough the cut out of the board frame before securing the 4 bolts 1 2 Unpack box 4 of 4 50 x 67 table top and hang the board onto the frame Secure the board to the frame using the 4 x M6 x 70 0 23 x 2 7...
Page 3: ...in the board and plug in the connector Plug in both cables into the Control Pad USB 3 5mm audio 7 8 Attach Finger Touch Unit with 3 x Phillips head screws 0 165 x 1 25 Attach Touch Panel with 4x Phill...
Page 4: ...on will immediately stop the movement In case of emergency just unhand the control unit watch dog switch For further information your dealer will be at your disposal User guide for electrical height a...
Page 5: ...ction If the picture is bigger at the top than at the bottom secure the screws C and D or loosen the screws A and B at the same time If the picture is smaller in the top than in the bottom tighten A a...
Page 6: ...y Max load capacity of the lift unit is 300 lbs Do not add any additional weight to the system other than the components described in this manual Do not sit hang or lie on the table VERY HEAVY UNIT Se...