- 11 -
08785150
Installation & Operation
Pre-Start-up Inspection Checks
This inspection should be done prior to the
compressor test.
I. Check all assemblies, clamps, fittings, hose
connections, nuts, and bolts to ensure they are
properly tied and secured to the vehicle. This
is a very critical area of inspection. The
vehicle should not be moved until this
inspection has been completed.
II. Remove all tools, rags, and installation
equipment from the area.
III. Check compressor oil level and check all
valves to ensure they are in correct operating
position.
IV. Vacuum all areas that have metal or plastic
shavings. Wipe all fingerprints off unit and
vehicle.
Check All Fluid Levels
Position the unit on a level surface so that proper
amount of fluids can be added.
I. 5 gallons of gasoline
II. Engine oil level may have to be topped off
after test.
III. Check compressor oil level
A. Add oil if needed.
B. Additional oil may need to be added after
test.
C. Top off oil level to half the sightglass
when finished with the test.
Machine Documentation
Record all serial numbers for this installation.
A. Condux International Inc. Serial Number
_________________________________________
B. Engine Serial Number
_________________________________________
C. Compressor Serial Number
_________________________________________
D. Note any special applications relating to
specific installations
_________________________________________
_________________________________________
_________________________________________
Operating Procedure
I. Read this manual carefully before proceeding.
II. Verify the service valve is closed.
III. Pull the choke cable and start engine. If the
engine is warm or the ambient temperature is
high, pull the choke knob halfway, or keep it
fully open.
IV. Allow 3-5 minutes for engine to warm up
V. Open service valve
Summary of Contents for Gulfstream 35
Page 2: ...2 08785150...