![Condair DRAABE HighPur Installation And Operating Instructions Manual Download Page 29](http://html1.mh-extra.com/html/condair/draabe-highpur/draabe-highpur_installation-and-operating-instructions-manual_2651714029.webp)
29
Electrical connection of the nebulizers
7.4
Connection DRAABE NanoFogEvolution / NanoFogSens
The scope of delivery of the quick installation kit (SMB) comprises a pre-packed 3 m supply cable, incl.
plug (socket side) [3], and a junction box [2]. Only the supplied supply cable [3] may be used to connect
the nebulizer.
You must ensure that the protective earth (color: green/yellow) is connected. All cable ends must be
fitted with suitable ferrules.
Connect the connectors as follows:
Line [1.3]
JZ-600 5x0.5mm²
1)
Line [1.3]
YSLY-JB 5x0.5mm²
1)
Pin assignment
[4] plug/socket
Description / function
1
Brown (BN)
1
Phase L1 (120 or 230 VAC)
2
Black (BK)
2
0 VDC / GND
3
Blue (BU)
3
Neutral conductor N (120 or 230
VAC)
4
Grey (GY)
4
24 VDC
Green/yellow (5)
Green/yellow (GN-YE)
5
Protective earth
1)
Depending on the selected cable during installation, different cable types may have been selected.
1
PE
24 VDC
N
0 VDC
L1
GN-YE
4 / GY
3 / BU
2 / BK
1 / BN
1, L1 2, GND 3, N 4, 24 VDC GN/YE, PE
2 3 4 5
JZ-600 /
YSLY-JB
JZ-600 /
YSLY-JB
JZ-600 /
YSLY-JB
1
2
2
3
4
Wago 221-615
5x
4
Fig. 16: Connection DRAABE NanoFogEvolution / NanoFogSens
1 supply line (5x0.5 mm²) from the HumPower control unit
2 junction box (maximum 2 nebulisers per junction box)
3 supply line (5x0.5 mm²) with plug connector (socket side)
4 nebuliser connection with socket/pin contact
Summary of Contents for DRAABE HighPur
Page 1: ...2603250 0 EN 2112 INSTALLATION AND OPERATING INSTRUCTIONS Humidification system DRAABE HighPur...
Page 41: ...Notes...
Page 42: ...Notes...
Page 43: ......