3
7
Commissioning
7.1
7.2
7.3
Operation
Testing
S testing remote monitoring.
24
24
25
8
Servicing
8.1
8.2
8.3
8.4
8.5
Live Status
LCD, LED, and sound indications.
Thermal cut-out (TCO) reset
Action after every activation
Servicing and fluid replenishment
26
27
28
29
29
9
Miscellaneous
9.1
9.2
9.3
9.4
Glossary
FAQ
End of product life policy
Warranty terms and conditions
30
31
31
32
Summary of Contents for Sentinel S100
Page 1: ...SENTINEL S70 S100 S150 v7 v1 2 INSTALLATION AND OPERATION MANUAL Revised Version July 2022 ...
Page 14: ...13 Connections 5 5 1 CIRCUIT BOARD LAYOUT ...
Page 15: ...14 5 2 CONNECTION DIAGRAM USING SMOKE SCREEN INTERFACE Recommended ...
Page 16: ...15 5 3 CONNECTION DIAGRAM GENERIC ...
Page 35: ...34 Installer Notes ...