31
9.2 FAQ
Q
The Smoke Screen is indicating it is ready to operate but does not respond to a full alarm
test.
A
Ensure ‘Service Mode’ is disabled.
With power applied, and keeping clear of the smoke nozzle, disconnect the ‘Alarm’ / ‘Trigger’ and
‘Hold-off’ connection plugs from the PCB. If the Smoke Screen produces smoke, there is a
misconnection in the system wiring.
Q
The Smoke Screen is puffing out smoke whilst heating up.
A
This is the result of very small amounts of air and residual fluid in the heater block being changed into
an insignificant volume of smoke and can happen particularly after the Smoke Screen has been moved
about when cold, i.e., prior to installation or in the time after an activation.
9.3 END OF PRODUCT LIFE POLICY
At Concept Smoke Screen we take our environmental obligations very seriously and constantly strive to
minimise any environmental impact of the products we sell.
To comply with the WEEE Regulations 2013 we label all relevant products with the crossed-out wheelie bin
symbol and are members of the Comply Direct WEEE compliance scheme. Comply Direct have registered us
with the Environment Agency as a Producer and will arrange to have any of our equipment collected and
recycled as necessary. Comply Direct can be contacted on 0844 873 1034. If arranging a collection, please
quote our membership number which is CD01/00593. Our Environment Agency Producer Registration
number is WEE/HB3530XZ.
How to return goods
When the goods are no longer required or are deemed to be beyond economic repair you can also return
the goods to the following address for disposal:
Smoke Screen, 1C North End Business Park, Station Road, Swineshead, Lincolnshire, PE20 3PW
Alternatively, if it is more convenient to arrange disposal locally, please ensure disposal is carried out in
accordance with any local guidelines.
Further guidance can be found here
https://www.complydirect.com/the-recycling-room/
Summary of Contents for Sentinel S100
Page 1: ...SENTINEL S70 S100 S150 v7 v1 2 INSTALLATION AND OPERATION MANUAL Revised Version July 2022 ...
Page 14: ...13 Connections 5 5 1 CIRCUIT BOARD LAYOUT ...
Page 15: ...14 5 2 CONNECTION DIAGRAM USING SMOKE SCREEN INTERFACE Recommended ...
Page 16: ...15 5 3 CONNECTION DIAGRAM GENERIC ...
Page 35: ...34 Installer Notes ...