Summary of Contents for Radyne RCU101
Page 7: ...TM054 Rev 2 2 vi...
Page 9: ...Description SFC4200 C Band Downconverter Page 1 2 TM054 Rev 2 2...
Page 11: ...Installation RCU101 1 1 Protection Switch Page 2 2 TM055 Rev 2 2...
Page 12: ...RCU101 1 1 Protection Switch Installation TM055 Rev 2 2 Page 2 3...
Page 21: ...Operation RCU101 1 1 Protection Switch Page 3 4 TM055 Rev 2 2...
Page 22: ...RCU101 1 1 Protection Switch Operation TM055 Rev 2 2 Page 3 5...
Page 24: ...Maintenance RCU101 1 1 Protection Switch 4 2 TM055 Rev 2 2...
Page 25: ...TM055 Rev 2 2 Page 5 1...
Page 27: ...RCU101 1 1 Protection Switch Serial Protocol TM055 Rev 2 2 A 2...
Page 28: ...TM055 Rev 2 2 B 1 Appendix B RCU101 Block Diagram Configuration Drawings and Schematics...
Page 29: ...TM055 Rev 2 2 B 2 Figure B 1 Functional Block Diagram...
Page 30: ...TM055 Rev 2 2 B 3 Figure B 2 Top Level Assembly...
Page 31: ...TM055 Rev 2 2 B 4 Figure B 3 AS 3265 Front Panel Assembly...
Page 32: ...TM055 Rev 2 2 B 5 Figure B 4 AS 3527 Switch Assembly...
Page 33: ...TM055 Rev 2 2 B 6 Figure B 5 AS 3527 Switch Assembly...
Page 34: ...TM055 Rev 2 2 B 7 Figure B 6 CA 4014 Cable Assembly...