![Comtech EF Data Radyne RCU101 Installation And Operation Manual Download Page 23](http://html1.mh-extra.com/html/comtech-ef-data/radyne-rcu101/radyne-rcu101_installation-and-operation-manual_2648531023.webp)
RCU101 1:1 Protection Switch
Maintenance
TM055 - Rev. 2.2
Page 4-1
Section 4 - Maintenance
4.0 Periodic
Maintenance
The RCU101 requires no periodic field maintenance procedures. The unit contains no
adjustments. Should a unit be suspected of a defect in field operations after all interface signals
are verified, the proper procedure is to replace the unit with another known working unit. If this
does not cure the problem, faulty cabling or power should be suspected.
A fault in the operation of the RCU101 should become evident through an illogical LED
indication on the front panel. For example, failure of the RF transfer switch will become
immediately obvious when all four LEDs of the graphical transfer switch display on the front
panel illuminate. In this case, the RCU101 logic has commanded the transfer switch to a certain
position. This will illuminate the new position but the relay remains stuck in the old position.
Verification of the operation of the IF and RF transfer switches can be verified through a DC
continuity check at the BNC and RF connectors at the rear of the RCU101. The RF and IF cables
will need to be removed to perform this test. Failure of either the IF or RF transfer switch can be
verified by checking the voltage to the coils on either relay assembly. The IF transfer switch coil
should have 4.5 Vdc and the RF transfer switch Coil should have 14.0 Vdc across the coil (not to
ground). If a fault in either the RF or IF transfer switch module is suspected, these assemblies
can be changed in the field.
Summary of Contents for Radyne RCU101
Page 7: ...TM054 Rev 2 2 vi...
Page 9: ...Description SFC4200 C Band Downconverter Page 1 2 TM054 Rev 2 2...
Page 11: ...Installation RCU101 1 1 Protection Switch Page 2 2 TM055 Rev 2 2...
Page 12: ...RCU101 1 1 Protection Switch Installation TM055 Rev 2 2 Page 2 3...
Page 21: ...Operation RCU101 1 1 Protection Switch Page 3 4 TM055 Rev 2 2...
Page 22: ...RCU101 1 1 Protection Switch Operation TM055 Rev 2 2 Page 3 5...
Page 24: ...Maintenance RCU101 1 1 Protection Switch 4 2 TM055 Rev 2 2...
Page 25: ...TM055 Rev 2 2 Page 5 1...
Page 27: ...RCU101 1 1 Protection Switch Serial Protocol TM055 Rev 2 2 A 2...
Page 28: ...TM055 Rev 2 2 B 1 Appendix B RCU101 Block Diagram Configuration Drawings and Schematics...
Page 29: ...TM055 Rev 2 2 B 2 Figure B 1 Functional Block Diagram...
Page 30: ...TM055 Rev 2 2 B 3 Figure B 2 Top Level Assembly...
Page 31: ...TM055 Rev 2 2 B 4 Figure B 3 AS 3265 Front Panel Assembly...
Page 32: ...TM055 Rev 2 2 B 5 Figure B 4 AS 3527 Switch Assembly...
Page 33: ...TM055 Rev 2 2 B 6 Figure B 5 AS 3527 Switch Assembly...
Page 34: ...TM055 Rev 2 2 B 7 Figure B 6 CA 4014 Cable Assembly...