background image

Verify pigtail length by wrapping it
around the spool.

12

13

Weld pigtails to cable fibers according to
welding device instructions.
Use only 40 mm long HSP with 2.4 mm
diameter in w

elded position!

Carefully insert FSP into designed space.
Two HSP can be placed in each space, one on
onto another. Slightly pressing in the middle of
HSP it should easily fixate into holder.

Do not in any case try to fixate FSP holding it
by its ends!

14

15

When all units are assembled screw upper and lower cover to whole unit using screws
from the plastic bag.

Place patch-panel into 19-inch enclosure or rack and fixate it with four screws.
Panel take up 1U space.

16

FOB-21 Installation guide

Page 5

COMTECH ltd.

We are certain that following these mounting regulations, you will be able to make secure and compact
optical cable installations!

Yours COMTECH.

Summary of Contents for FOB-21

Page 1: ... examine our installation guide step by step to ensure successful and qualitative installation There is an opening in each unit which allows incoming cable to be lead trough all units Similar openings if required are possible to make in the patch panel s backside In upper part of the panel optical welding cassettes are placed which includes place for 12 weldings in each unit altogether 60 optical ...

Page 2: ... possible to install FO converter If required patch panel FOB 21 may be used for passive splitter installation 2 Clear off the cable of its outer isolation about in one meter length Unpack patch panel and remove upper and lower metal covers Inside the panel you will find a bag with cover fastening screws and plastic strips 1 Our company continues to work on improving our products so there could be...

Page 3: ...re using thicker than 7mm cable place it through previously cut opening so that inside the enclosure should be 30 cm long cable ending Create cable bends to other units 4b 5a Pull cable trough PG 9 so that in the patch panel there should be 5 cm long cable outer isolation and pull tighter cable fastening screw nut If you are planning to convey incoming cable to another unit leave a bit longer cabl...

Page 4: ...etween units pull sectors till necessary unit fasten it and pull sectors to panel s surface 6 7 8 Cleared fiber must be placed inside the cassette in three circles 9 Insert adapters in front panel 10 Insert connector pigtails into adapter Pigtails should be previously cut 35 37 cm in length 11 Pigtail ends should be lead onto panel s surface through designed openings ...

Page 5: ...e middle of HSP it should easily fixate into holder Do not in any case try to fixate FSP holding it by its ends 14 15 When all units are assembled screw upper and lower cover to whole unit using screws from the plastic bag Place patch panel into 19 inch enclosure or rack and fixate it with four screws Panel take up 1U space 16 FOB 21 Installation guide Page 5 COMTECH ltd We are certain that follow...

Reviews: