Verify pigtail length by wrapping it
around the spool.
12
13
Weld pigtails to cable fibers according to
welding device instructions.
Use only 40 mm long HSP with 2.4 mm
diameter in w
elded position!
Carefully insert FSP into designed space.
Two HSP can be placed in each space, one on
onto another. Slightly pressing in the middle of
HSP it should easily fixate into holder.
Do not in any case try to fixate FSP holding it
by its ends!
14
15
When all units are assembled screw upper and lower cover to whole unit using screws
from the plastic bag.
Place patch-panel into 19-inch enclosure or rack and fixate it with four screws.
Panel take up 1U space.
16
FOB-21 Installation guide
Page 5
COMTECH ltd.
We are certain that following these mounting regulations, you will be able to make secure and compact
optical cable installations!
Yours COMTECH.