2–1
Chapter 2. INSTALLATION
2.1
Unpacking and Inspecting the Shipment
Figure 2-1. Unpacking and Inspecting the Shipment
The CRS-150 1:1 Redundancy Switch and its Installation and Operation Manual were packaged
and shipped in a reusable cardboard carton containing protective foam spacing.
This equipment contains parts and assemblies sensitive to damage by
Electrostatic Discharge (ESD). Use ESD precautionary procedures when
handling the equipment.
Once opened, inspect the shipment:
Step
Task
1
Keep all shipping materials for storage or reshipment.
2
Check the packing list to ensure the shipment is complete.
Summary of Contents for CRS-150
Page 14: ...CRS 150 1 1 Redundancy Switch Revision 2 Preface MN CRS150 IOM xiv Notes...
Page 22: ...CRS 150 1 1 Redundancy Switch Revision 2 Introduction MN CRS150 IOM 1 8 Notes...
Page 42: ...CRS 150 1 1 Redundancy Switch Revision 2 Connector Pinouts MN CRS150 IOM 3 18 Notes...
Page 74: ...CRS 150 1 1 Redundancy Switch Revision 2 Cable Drawings MN CRS150 IOM A 12 Notes...
Page 76: ...2114 WEST 7TH STREET TEMPE ARIZONA 85281 USA 480 333 2200 PHONE 480 333 2161 FAX...