Required Tools: 
Wheel Barrow 

 

 

 

Level  

Shovel   

 

 

 

Open end of box wrench’s:  

Digging Bar or Pick 

 

 

5/8”, 9/16”, ¾”, ½” 

Allen Wrench (provided)   

 

Ratchet Handle & Sockets: 

Hammer or Mallet 

 

 

5/8”, 9/16”, ¾”, ½”, 17mm 

Market Pen  

 

 

 

Cordless or electric drill w/bits as follows: 

Ladder   

 

 

 

Phillips, 13/64”, 3/8” drill bit 

Tape Measure 
 

Please read and understand all instructions before beginning 

*Before digging, Please obey local laws by notifying your local utilities marking organization* 

1. Select an area in your yard that is reasonably level and meets the space requirements for your equipment. PH35-10 Ground 

space: 8’ x 32’. Play space: 12’ x 43’.  

2. Position the horizontal ladder in your yard where you want the unit to finally stand. Measure and be certain that all 

necessary clearances for the deck and swinging space are available in this position.  

3. Using a tape measure and marker, mark location of the Ladder and swing hangers along the 5’ top rail. See the detail on 

the front page of your installation instructions.  

4. With the horizontal ladder in position on the ground, locate and mark the holes for the two upright ladders. Move the 

horizontal ladder out of the way and dig the holes for the upright ladders. (See #1: Hole size for upright ladder)  

5. Lay each vertical ladder on the ground near the hole where it will eventually stand. Make a mark 15” from the top of the 

ladder onto each ladder rail of the 8’ four rung. Make a mark 39” from the top of the ladder onto each ladder rail of the 
10’ ladder. Move the adjustable sleeves to these marks and position them to receive the horizontal ladder by turning them 

to point at a 90 degree angle (towards what will become the inside of the structure.) Away from the upright ladder. 
Secure the set screws.  

6. Place the vertical ladders onto their sides. Hint: The 8’ four rung is used for access to the deck. The 10’ three rung is to be 

used at the swings end away from the deck. The ladder rungs should be positioned to allow for access into the Playhouse. 

Attach the overhead ladder to the vertical ladders and secure the set screws. See #4 horizontal ladder connection to 
upright ladder. Hint: Do not push the overhead ladder tight against the vertical ladders. Leave a ½” to 1” gap between 

the vertical ladder rails and the overhead ladder. This will allow for easier adjustment of the overhead ladder in the 
future.  

7. Using two strong adults, stand the horizontal ladder portion into the holes previously dug.  
8. Insert the 5’ top rail into the top sleeve of the vertical ladder that will be used to access the Playhouse deck.  

9. Measure the height of the top rail to insure proper swing height. Level the structure.  
10. Refer to: Playhouse Assembly and Installation Instructions. Assemble the Playhouse deck and structure, and position the 

deck as shown.  

11. Attach the slide as shown on the slide assembly sheet.  

12. Attach any additional climbers as may be necessary.  
13. Using a tape measure and marker, measure and mark the locations of the swing hangers and the vertical ladder along the 

length of the 8’ top rail. (Refer to the detail on the front page of the PH 35 installation instructions.)  

14. Install the 8’ top rail into the top sleeve of the vertical ladder at the swing end of the horizontal ladder. Securely tighten 

the set screws in the top sleeve of the vertical ladder.  

15. Assemble swing hangers as shown on the swing hanger assembly sheet and attach to the top rails as instructed.  
16. Using a hammer, install the 2-3/8” plugs into the open ends of the top rails.  

17. Before installing the third leg, locate the un-smashed end of the third leg with the hole drilled approximately 3” from the 

bottom. Insert ⅜” x 3½” Hex Bolt and loosely thread ⅜” Nut on the other side. Nut will not thread all the way on and 

bolt will be loose. (This is to act as an anchor in the concrete and does not need to be tight.)  

18. Install the third leg onto the 10’ ladder by first measuring away from the ladder about 5-1/2’. Mark the spot and dig the 

hole about 18” deep. Drop the leg into the hole and place the smashed end over the bolt that is welded to the ladder top 
sleeve.  

19. Securely fasten the third leg to the ladder with a 3/8” nyloc nut. Hint: The third leg can be used to help level the structure 

by pushing or pulling the ladder as may be necessary.  

20. Check the level of the entire structure and adjust as necessary.  
21. When you are satisfied that the structure is level, mix and pour the concrete according to the package directions. You will 

use approximately seven 80# bags in the ladder hole and 1 ½ bags in each of the leg holes.  

22. Allow the concrete to cure completely before using your swing set. (3-5 days).  
23. Attach chains and swinging items and enjoy your Component Playground. 

  

Summary of Contents for Swing Set PH35-10

Page 1: ...py of the receipt with wording such as missing xyz part etc Note some shipments will have more than one pallet so check both before noting missing 4 Similar to 3 above also note the condition of the p...

Page 2: ...fication PH35 10 Swing Set Page 1 of 3 Quantity Description 2 Box Containing Swing Set Parts 2 PH Side Canopy Support 1 PH Canopy Center Canopy Support 4 2 3 8 x 6 PH Legs 2 PH Deck Package 1 bundle o...

Page 3: ...dentification PH35 10 Swing Set Page 2 of 3 Quantity Description 2 PH Full Barrier 1 PH Exit Barrier 1 PH Entrance Barrier 1 2 3 8 x 9 Top rail 1 2 3 8 x 5 6 Toprail 1 1 7 8 x 9 6 Leg 1 1 7 8 x 13 Thi...

Page 4: ...0 Swing Set Page 3 of 3 Quantity Description 2 8 Upright Ladder with Sleeves Actual Length 10 1 10 Upright Ladder with sleeves Actual length 12 1 12 6 Horizontal Ladder 4 4 PH Floor Joist Ends 3 4 PH...

Page 5: ...Tap Bolt Hex Bolt Carriage Bolt Set Screw with Allen Wrench Lag Screw 14 Truss Screw 2 Self Tapping Screw Carabineer Spring Clip Panel Clamp Plastic Plug CH Deck Plug Pictures are not to sale The purp...

Page 6: ...the overhead ladder This will allow for easier adjustment of the overhead ladder in the future 7 Using two strong adults stand the horizontal ladder portion into the holes previously dug 8 Insert the...

Page 7: ...13 43 5 Clearance 10 Swinging Clearance Ground Space 9 x 32 Play Space 13 x 43 Model PH35 10 Installation Instructions 20 22 5 22 5 20 21 20 23...

Page 8: ...crete mix Hole 28 x 20 x 24 deep approx 7 80 lb bags of concrete mix 24 28 20 Slide ladder into place on top rail and secure with 3 8 x 3 8 set screws Ladder Top Rail Upright Ladder Adjustable Sleeve...

Page 9: ...ide x 2 bolt through the two holes and secure with the 3 8 nyloc jam nut Insert 3 8 x 3 8 and 3 8 x set screw and tighten to help secure the 3rd leg in place 3rd Leg Sleeve Nyloc Nut 3rd Leg 3 Third L...

Page 10: ...ular swing set configuration This is the end that will bolt to the vertical ladder Determine which holes you will be using by identifying the configuration below that most closely resembles the config...

Page 11: ...frame on the ground as shown below Mark the holes for the Legs Dig the holes to the specifications below Hole size for Legs is 18 wide by 16 deep With top rail in place place deck frame square with t...

Page 12: ...ntal ladder by turning them to point at a 90 degree angle towards what will become the inside of the Horizontal ladder section of the structure Secure the set screws Notice Direction of the rungs on t...

Page 13: ...er the hole where it will finally stand Please make sure that the drilled ladder is placed at the end that is next to the Play House Platform Using two strong adults stand the horizontal ladder portio...

Page 14: ...rd should be flush with the edge of the square tubing Now that these two boards are secure lay each of the remaining boards up and onto the floor structure and space them out evenly and to your satisf...

Page 15: ...s Then insert and secure one set screw into each leg to hold them in place Note We suggest you use a structure of some kind to support the platform as you place the assembled deck structure in the pre...

Page 16: ...wn attaching platform to 8 vertical ladder You may need to adjust the depth of the individual holes to make the platform structure and the ladder level up to each other and to make the holes line up 1...

Page 17: ...ncrete will cure faster in warm conditions and slower in cold conditions The package directions on the concrete you buy will indicate approximate curing times If you are in doubt it is better to wait...

Page 18: ...red into place lay out the remaining boards onto the support structure Evenly space the boards as shown in the diagram shown below Beginning at one end it works best to secure each board in turn using...

Page 19: ...gles as shown below Use two of the eight sets of panel clamps with the 3 8 x 2 carriage bolt and 3 8 hex nut that are provided at each corner 45 Degree angle Top View 9 b Secure the barriers to the pl...

Page 20: ...oth of the six foot barriers with panel clamps as shown below 10 b Insert the canopy ridge pole into the brackets previously attached to the barriers Note Barrier configuration shown here is generic a...

Page 21: ...configuration shown here is generic and does not necessarily represent the barriers or configuration you may have purchased Attach one canopy side first and secure with 3 8 x 3 8 set screws down from...

Page 22: ...Step 1 Position slide on deck in desired location Step 2 Attach slide to deck with two 14 x 1 Truss Screws Slide Installation Instructions Deck Mount 14 x 1 Truss Screws Flat Washers...

Page 23: ...lts and enjoy your Component Playground Allow all of the concrete to cure completely before using your playground 3 5 days After concrete has cured assemble and attach accessories as described below 8...

Page 24: ......

Page 25: ...Washer Bracket with welded bolt Push two 1 3 8 Plugs in the ends Plastic Pivot 3 8 Nyloc Nut Pivot Plug Assemble Steering Wheel as shown above Then attach Bracket to the Barrier with panel clamps and...

Page 26: ...ic ring to the Bracket with welded washer Place the Base of the Telescope under the lip of the plastic ring and attach the other half of the plastic ring Telescope Base Plastic Ring Halves Bracket wit...

Page 27: ...ards in this type of equipment when used improperly Children should be instructed as to proper caution to take in its use Equipment should NOT be used when it is wet or icy Equipment should only be us...

Page 28: ...rdware stores and at Component Playgrounds The brass bushings inside of the swing hanger are impregnated with lubricant and will not generally require any further lubrication However these should be p...

Page 29: ...ife expectancy of the vinyl canopy is 3 5 years 7 Swing Seats These should be inspected at least twice annually and should be replaced as necessary 8 Slides Slides should never be lifted at the bottom...

Page 30: ...le helmets when using playground equipment 4 Remove drawstrings from hoodie s and jackets Remove attached mittens and gloves These can become entangled with the equipment and present the risk of stran...

Page 31: ...not cover damage resulting from flood fire catastrophe or other acts of nature To the extent permitted by law Component Playgrounds shall not be liable for any direct indirect special incidental or c...

Page 32: ..._____ CUSTOMER INFORMATION Project Name _______________________________________ Contact Person _____________________________________ Address ___________________________________________ City __________...

Reviews: