Model SS38-10 Continued
Top Rail
Set
Screws
Set Screw
20”
28”
24”
Upright
Ladders
Top Rail
Top Rail
Slide Top Rail joint into place
about 1 inch inside the Ladder
Top Sleeve & secure with two
3/8” x 3/8” Set Screws
Upright Ladder
set screw holes
Set
Screws
Set Screw
20”
28”
24”
Upright
Ladders
Hole 28” x 20” x 24”
(Approximately 6-7 80 lb. bags
of concrete mix per hole)
Set Screw
Upright Ladder
Set Screws
Set Screw
Adjustable Sleeve
Horizontal Ladder
Triple End
A-Frame
Leg
3/8” x 2 ¾” Hex Bolt with
3/8” Nyloc Nut (1 each per
leg)
3/8” x 3/8” Set
Screw (1 each per
leg)
Slide in leg, bolt in
place and secure
with set screw.
#2 A-Frame Leg Assembly
(B) A-Frame
Legs
Holes 18” x 12”
(Approx. 1 ½, 80 lb. bags
concrete mix per hole)
12”
18”
(A)
Upright
Ladder
20”
28”
24”
(C) 3
rd
Leg
Hole 18” x 18”
(approx. 2, 80 lb.
bags of concrete mix)
A-Frame Leg attachment to Triple
End
Triple
End
A-frame
leg
3/8”x 2 ¾” Hex bolt
with 3/8” nyloc nut (1
each per leg)
3/8”x 3/8” set screw
(1 each per leg)
Slide in leg, bolt in
place and secure with
set screw
Ladder to Top Rail Assembly