Top Rail Assembly
Step 1: Slide the Swing Hangers and tighten onto the Top Rail during the Top Rail
Assembly process. (Refer to spacing diagram and graphic found above)
Step 2: Slide the ends of the 10’ Top Rail as far as it will go into the Sleeve of the
Triple End.
Step 3: Insert and tighten (4) 3/8” x 3/8” set screws into each of the Triple End
Sleeves using Allen Wrench provided.
Step 1
Step 2