36”
Stake Chain in
bottom of trench
Deck
Deck
36”
Dig Trench 36” wide x 12” x 12” deep Use
approx. 4-5 80 lb bags of concrete mix
Top View
Side View
1. Assemble the Chain net portion of the
Climber to the bracket using provided
Clevises. The longest length of the chains
should gather on the ground.
2. Mark the center of the trench by
measuring along the ground 36” from the
edge of the deck. Dig trench 36” wide x
12” x 12” deep.
3. The Climber should be staked (stakes
are not provided) into the bottom of the
trench to apply and maintain proper
tension and angle of ascent onto the
Climber until cement cures. Leave excess
chain in the bottom of the trench.
4. Pour cement and allow to cure 3-5 days.
INSTALLATION INSTRUCTIONS
Pirate Climber for Play House