3.e. Make a mark in the soil for the A Frame Leg holes. Move the legs out of the way and dig the holes.
“A” Frame leg
holes are to be dug
at 18” in diameter
by 12” deep.
**Notice Most of the “A” frame leg hole needs to be dug towards the inside of the “A” frame leg.
3.f. When the holes are dug, place the legs into them and level the swing structure.
Level
Lev
e
l
Summary of Contents for CH30-10
Page 27: ......