3
Section 2
Operation
This section describes how to set up and make
measurements with your tester. We recommend
that you read the entire section carefully so that
you can use all of the features of your Tester.
Setting up your tester
Your tester is shipped in a special protective
container that should prevent damage to the
instrument during shipping. Check the shipping
order against the contents of the container and
report any damage or short shipment to
Compliance West USA. The container should
include the following:
•
The GFM-40ac Tester
•
A 10 AWG Test Lead
•
An 18 AWG Line Power Cord
•
A 10 AWG Test Cord
•
A plastic calibration screwdriver
•
An alligator clip/wire assembly
•
This Instruction Manual
If reshipment of the instrument is necessary,
please use the original shipping container. If the
original shipping container is not available, be
sure that adequate protection is provided to
prevent damage during shipment. We
recommend that the instrument be surrounded by
at least three inches of shock-absorbing material
on all sides of the container.
Remove the Tester from its container and place
it on a test bench.
AC Line Voltage Requirements
AC line voltage requirements for your Tester
are noted on the rear panel of the instrument. Do
not connect the instrument to a different voltage
source.
Fuse Replacement
There is a user-replaceable fuse (F1) located on
the rear panel of the instrument. It is located
behind a door in the Power Inlet-Power Switch-
Fuseholder device. The fuse rating is noted on
the rear panel. Do not attempt to replace it with
a fuse of any other rating.
Use the following procedure to replace the fuse
F1:
1. Turn the power switch to the O or off
position.
2. Unplug the instrument from the source of
suppy.
3. Remove the power inlet cord from the
instrument.
4. Using a small screwdriver, pry open the
fuseholder door.
5. Replace the fuse with a new one of the
correct rating.
6. Replace the fuseholder door and power inlet
cord.
Summary of Contents for GFM-40ac
Page 1: ...GFM 40ac Ground Circuit Tester Instruction Manual COMPLIANCE WESTUSA ...
Page 4: ......
Page 14: ......