Routine Service and Maintenance
Replacing the Digging Teeth
Due to the high amount of wear placed on the digging teeth, you will need to replace them
periodically. To replace a single tooth (Items 3 and 5,
Figure 4–20
), remove the bolts and nuts
(Item 1 and 2,
Figure 4–21
) securing the tooth to remove it, and then install a new tooth in the
same position.
The spacer tubes (Item 4,
Figure 4–21
) will fall free. Make sure to reinstall these when the new
tooth is installed.
Torque the bolts securing the teeth to 27 to33 ft.-lb.
Figure 4–21 Tooth Replacement