background image

INSTALLATION AND OPERATION MANUAL 

CLFE(X)IPS

 

INS_CLFE(X)IPS_REV– 

12/15/11 

PAGE 15

Tech SupporT: 1.888.678.9427

Appendix A

Software Acceptance Terms and Conditions

ACKNOWLEDGMENT

BY INSTALLING THE SOFTWARE, YOU ACKNOWLEDGE THAT YOU HAVE READ AND UNDERSTAND THE FORE 
GOING AND THAT YOU AGREE TO BE BOUND BY ITS TERMS AND CONDITIONS. YOU ALSO AGREE THAT THIS 
AGREEMENT IS THE COMPLETE AND EXCLUSIVE STATEMENT OF AGREEMENT BETWEEN THE PARTIES AND 
SUPERSEDES ALL PROPOSED OR PRIOR AGREEMENTS, ORAL OR WRITTEN, AND ANY OTHER COMMUNICATIONS 
BETWEEN THE PARTIES RELATING TO THE LICENSE DESCRIBED HEREIN.

GRANT OF LICENSE

License for software use is hereby granted to user only provided purchase has been made from an authorized 
Communication Networks (dba “ComNet”) dealer or authorized hereby authorized by ComNet. License is 
not transferable and is limited to usage only. No permission is hereby given or granted to make any change, 
modifications and is restricted only for its intended usage. 

Operation or usage other than described will considered as a violation of intended use.

DISCLAIMER OF WARRANTY

Software is provided As Is with all faults. To the extent permitted by law, ComNet, its dealers. Distributors and other 
appointed agencies hereby disclaim all warranties, whether expressed or implied, including and without limitations 
warranties that the product is free of defects, merchantability, fit for a particular purpose and non-infringing. You 
agree to bear the entire risk as to selection the proper for your purpose and as to the quality and performance of 
the product.

LIMITATION OF LIABILITY

Except as required by law, ComNet and its distributors, directors, licensors, contributors and agents and  all 
associated in with ComNet in connection with the said software will not be liable for any damages arising out of 
or in any way relating to this product and/or agreement  the inability arising out of or in any way relating to this 
agreement or the use of the product, and those products associated with said use of products, including limitation 
damages for loss of physical property, goodwill, work stoppage, lost profits, loss of data and computer failure or 
malfunction. Even if advised as the potential from such loss or damage regardless of the theory applied of contract, 
tort or otherwise, which claims are based. ComNet, its associates and all others collective liability will be limited to 
the cost of the product itself. 

ARBITRATION

Any disagreement between the parties relating to any interpretation, construction, performance or breach of this 
Agreement shall be settled by arbitration to be held in Fairfield Country, Connecticut, in accordance with the laws 
of the State of Connecticut in accordance with the rules then in effect of the American Arbitration Association. The 
arbitrator may grant injunctions or other relief in such dispute or controversy. The decision of the arbitrator shall be 
final, conclusive and binding on the parties to the arbitration. Judgment may be entered on the arbitrator’s decision 
in any court having jurisdiction. The party bring arbitration agrees to incur the total costs and expenses of such 
arbitration and shall pay their counsel fees and expenses. 

Summary of Contents for CLFE IPS Series

Page 1: ...ons are required and they are completely transparent to the Ethernet network and higher layer protocols LED indicators are provided for rapidly ascertaining the operating status of the device See Figu...

Page 2: ...RS 232 USB Setup Port 1 Hi Power POE Midspan CLFE8IPS Made in U S A Port 2 Port 3 Port 4 Output Input Communication Networks Port 5 Port 6 Port 7 Port 8 Power RS 232 USB Setup Port 1 Hi Power POE Mid...

Page 3: ...ged High Power Midspan NVR CLFE16IPS Switch CNGE2FE24MS Data Power Data Power CLFE1UTP CLFE1UTP CLFE1UTP CLFE1UTP PoE Camera PoE Camera Installation Connect the unit to the included AC Power Adapter a...

Page 4: ...g system Windows XP Vista and Windows7 It requires Microsoft NET Framework installed on the host computer Port Communication Serial or USB port Firmware Window Warning Upgrading firmware is not part o...

Page 5: ...ing and does not need this step Status Command Progress This bar will display the progress of commands Commands Browse The File browse dialog box will be opened to select the firmware file to be used...

Page 6: ...configured user defined limit is budgeted If violation type is None then budgeted power is based on port mode For Normal Mode the power budgeted is 16 2W For High Power Mode the power budgeted is bas...

Page 7: ...of the port Dynamic wo Priority The power is budgeted based on the Load ILIM ICUT Configuration Set the Current Limit and Current Cut Limit ILIM ICUT Status Chip ID Show the current PSE control Chip R...

Page 8: ...ws the Midspan total available power Port Allocated Shows the total power allocated by the system The allocated power varies based on the selected Power Management Mode Power Delivering Shows the tota...

Page 9: ...AGE 9 Tech Support 1 888 678 9427 Port Power Shows the power currently delivered by the port If the port is not in Delivering mode it will show N A Commands Poll If the Poll box is checked it will ena...

Page 10: ...elected ports Force Power Check this box to force selected the port to Power On This will bypass detection classification and power management steps and no violation will be honored Reset Statistics C...

Page 11: ...Class 0 will be used in Normal Mode and ILIM ICUT values in High power mode User Defined for limiting power based on user defined value Max Power Choose the user defined power value This value is use...

Page 12: ...ts the PD detection type to be used None for bypassing detection 2 point for 2 point detection 4 point for 4 point detection 4 point legacy for 4 point followed by legacy 2 point legacy for 2 point fo...

Page 13: ...port Normal for IEEE 802 3af mode High Inrush for Legacy devices which require more than 15 4W For port to deliver more than 15 4W appropriate ILIM ICUT value needs to be selected and classification n...

Page 14: ...ws how many times the port has been detected an invalid load Commands Disable Disables the port Buttons Disable Enable Force Power are mutually exclusive Enable Enables the port Buttons Disable Enable...

Page 15: ...er for your purpose and as to the quality and performance of the product LIMITATION OF LIABILITY Except as required by law ComNet and its distributors directors licensors contributors and agents and a...

Page 16: ...Agreement shall otherwise remain in full force and effect and enforceable in accordance with its terms This Agreement will not be governed by the United Nations Convention on Contracts for the Intern...

Page 17: ...9427 Figure A Dimensions are for the ComNet CopperLine CLFE8IPS and CLFE16IPS modules 17 43 2cm 1 75 4 45cm 12 27cm Installation Considerations The CLFE8IPS and CLFE16IPS can be installed as Standalo...

Page 18: ...fied by the manufacturer Unplug this apparatus during lightning storms or when unused for long periods of time Refer all servicing to qualified service personnel Servicing is required when the apparat...

Reviews: