Kit content 

*

Standard kit is listed below, alternative kits and accessories are available. 

1. Body and cover
2. Splicing tray with splice holder
3. Cable attachment bracket
4. Strength member lug
5. Transportation tubes
6. Set of sealing blocking rings
7. Gel strip
8. Cable plug
9. Cleaning tissue
10. Installation instruction
11. Fusion splice protectors
12. Tie wraps

2.3 

Additional tray kit 

2.3.1 

Tray kit – Tray 24

 

1.

Splicing tray with splice holder (Using Tray 24)

2.

Fusion splice protectors

3.

Transportation tubes

4.

Tie wraps

2.3.2 

Tray kit –Tray 48

 

1. Splicing tray (Using Tray 48)
2. Fusion splice protectors
3. Transportation tube
4. Tie Wraps

Installation conditions precautions 

3.1 

The closures can be installed at temperature between 

-5°C and 40°C.

3.2 

Follow  the  installation  instruction  steps  to  ensure  the 

performance of the closure. 

3.3 

It  is  necessary  to  take  precautions  and  keep  the 

working space clean to protect the closure sealing materials and 
splices. 

Cable Installation (Floating cable bracket) 

4.1 

Looped Cable  

4.1.1 

Make a window cut of 2600mm 

4.1.2 

Cut  the  loose  tube  of  the  to  be  spliced  fibers  in  the 

middle (1300mm) and continue the installation on 4.3 

4.2 

Drop cables 

4.2.1 

Remove the cable sheath over 1300 mm. 

Summary of Contents for SCIL-B

Page 1: ...les If other cable types slotted core or central core are used supplementary installation steps have to be made Contact the local agent to get the relevant accessories and instructions 1 2 Product description The SCIL B splice closure in line is a gel sealed fiber optic splice closure designed for cable joint applications in the telecom outside plant network The closure has maximum splicing capaci...

Page 2: ... Tie wraps 2 3 2 Tray kit Tray 48 1 Splicing tray Using Tray 48 2 Fusion splice protectors 3 Transportation tube 4 Tie Wraps 3 Installation conditions precautions 3 1 The closures can be installed at temperature between 5 C and 40 C 3 2 Follow the installation instruction steps to ensure the performance of the closure 3 3 It is necessary to take precautions and keep the working space clean to prot...

Page 3: ...that the lug lip the securing bolt and the hose clamp head are positioned downwards to the bottom of the closure Protect the cable hose clamp and the termination with some layers of PVC tape 4 7 Clean the cable sheath with the cleaning tissue 4 8 Select the appropriate blocking rings according to the cable outer diameter It is preferred that the blocking ring is slightly larger than the cable diam...

Page 4: ...n layers 4 13 Verify with a flat tool Continue wrapping the strip smoothly till the area between the two blocking rings is filled with gel strip 4 14 At the cable port where cable will be installed install two pieces of black tie wraps 4 15 Position the cable with the pre installed cable sealing block into the cable port and insert the cable attachment bracket into the holding slot as picture show...

Page 5: ...m from the cable window cut 5 3 Mark at 55mm and 90mm from the cable jacket end 5 4 Repeat installation step 4 8 4 9 Install 2pc ring trees over the cable 5 5 Wrap the cable with gel strip Verify with a flat tool Continue wrapping the strip smoothly till the area between the two blocking rings is filled with gel strip 5 6 Remove the block when cable OD 16mm 5 7 Tighten the screw to secure the stre...

Page 6: ...able ports 6 Fiber preparation 6 1 When using Tray 24 6 1 1 In case of a looped cable coil the loops and store them in the space in front of the tower of the closure loops can be stored around the tower as well 6 1 2 Remove the loose tubes of the to be spliced fiber bundles up to 150 mm from the cable jacket see drawing 5 1 4 6 1 3 Degrease the fiber bundle Slide the transportation tubes over the ...

Page 7: ... 2 1 In case of a looped cable Coil the loops and store them under the tray and use tie wraps to tie up the bundle 6 2 2 Remove the loose tubes up to 100mm from the cable jacket end 6 2 3 Degrease the fiber bundle and slide the transportation tubes over the fibers with overlap 100mm 6 2 4 Route the transportation tubes to the tray entrance as shown 6 2 5 Secure the transportation tube at the tray ...

Page 8: ...e Position the SCIL B close to the splicing machine in a convenient location and secure the closure 7 2 Slide the heat shrinkable splice protection over one fiber and fuse fibers according to local recommendations and procedures After the fusion splice is made install the heat shrinkable splice protection e g SMOUV with an appropriate heating source Allow the splice protection to cool down to ambi...

Page 9: ...lower tray 7 6 After use the tray wedge can be stored on the tower underneath the installed trays 7 7 Put on butterfly tabs and tray lid to secure the fiber if using 48 trays 7 8 Secure the trays by the Velcro 8 Closing of the closure 8 1 Close the cover by closing the latches in the proper sequence shown in 7 2 7 2 ...

Page 10: ...rting wire of the aerial cable Install the two pieces bracket facing with bowing outwards to interlock the aerial cable 9 2 Termination in manholes Secure the closure to the manhole frames with bolts in the provided positions on the bottom part of the closure 10 Re opening 10 1 Remove the latches in the reversed order as described in 7 2 ...

Page 11: ...11 ...

Page 12: ...nt any specifications or warranties relating to CommScope products or services This product is covered by one ore more U S patents or their foreign equivalents For patents see www commscope com ProductPatent ProductPatent aspx To find out more about CommScope products visit us on the web at www commscope com For technical assistance customer service or to report any missing damaged parts visit us ...

Reviews: