CFP700 Instruction Guide 

including

CFP701 Accessory Kit 
CFP702 Z Brackets 

Summary of Contents for CFP700

Page 1: ...CFP700 Instruction Guide including CFP701 Accessory Kit CFP702 Z Brackets ...

Page 2: ...he Castors from the forks Using 4x 12x30mm bolts and nylock nuts secure the castors to parts 431 ensuring the lockable castors go on the short end rear Replace the castors into the forks and hammer the End Caps in position ...

Page 3: ...r Step 3 Locking bars Using 2x 6x12mm Socket Head Cap Screws nylock nuts and 4x small 6mm washers secure the screws into parts 968 as show Place both parts 968 onto a flat surface so the side with the five holes is on the flat Pushing up from the bottom secure the Cap Screw with the two small 6mm washers and nylock nuts Replete for both sides ...

Page 4: ...bars to parts 969 and 971 as shown Step 5 Tilt brackets to 970 brackets Using 2x 10x20mm bolts 2x 10mm washers and nylock nuts secure the tilt brackets 969 971 to the 970 brackets as shown Do not overtighten the nuts One 10mm washer on the outside and one between parts 969 971 and brackets 970 969 971 ...

Page 5: ...h end between 973 and the actuator Using 8x 6mm Cap Screws secure these parts in place Step 7 Using a minimum of two people raise the actuators so there base is sitting on a flat surface Tilt the Tilt Brackets so they are at 90 as shown Then flip this apparatus over And place the base on top Ensuring the rear of the top frame lines up with the rear of the base Using 8x 6mm Cap Screws secure the ba...

Page 6: ... the bottom hold the control box up and line up the holes in part 973 sandwiching the Laptop Tray between parts 973 and the control box Using 3x 4x12mm screws and nylock nuts secure the control box into position Using 2x 4x8mm screws and nylock nuts secure the power board into position on the front wall of part 973 as shown ...

Page 7: ...power board lead through the hole in the back of part 973 pull out the lead retaining brackets and bend into a 45 shape as shown Plug the IEC power lead into the power board Step 9 VESA Rails Using 8x 8x12mm bolts and nylock nuts secure the top part 974 into position as shown Then loosely secure the bottom part 974 into position it should be able to freely move within the slots this part will be s...

Page 8: ... required to be purchased These parts will centralise the panel VESA to the trolley VESA These Z brackets can also be used for VEAS mounting sizes that don t meet the trolleys hole VESA lay out Step 13 Apply power to the power board and the LED controller will light up Press the down button until the actuators fully retract Release the down button for 3 5 seconds then press and hold the down butto...

Page 9: ...ket until the bottom two bolts line up Once all the bolts are secured in place but not fully tensioned raise the panel to the vertical position then full tension all bolts including the 8x12mm bolt holding part 974 to the tilt brackets Tilting the panel to adjust the viewing angle Push out and lean back at the same time on the locking bars Allow them to slot into the required position once the vie...

Page 10: ...ansportation Please ensure the panel is lowered to it s lowest point prior to any movement Warning he rear castor brakes are only to be used during the transportation faze Always leave the castors unlocked for normal classroom use Bolt Pack 4x8mm Screw x 6 4x12mm Screw x 3 4mm Nylock Nuts x 9 6x12mm Socket Head Screw x 31 6mm Nylock Nut x 11 6mm Washer Small x 4 8x12mm Bolt x 8 8x20mm Bolt x 4 8x6...