8
3. Connectors:
3.1 AC input connector: 4 Wire Hubbell male twist lock plug, Comdel P/N JH5005 (Hubbell
CS6365) with 6 feet of power cord (UL/CSA/VDE rated).
3.2 RF output connector: HN female
3.3 Remote Interface Connector: 25 pin D-sub male on generator.
4.
Warning Labels:
4.1 Safety Labels for hazardous voltages, Heavy Object, and Caution for lifting by water fittings
are to be provided on operator visible areas of the generator. IEC standard symbols in user
visible areas for start, stop, enable and cautionary conditions, PE ground, high temperatures
and RF energy present.
4.2 Special marking available at customers specifications
C. Environmental Specifications
1.
Operating Temperature & Humidity
1.1 Operating ambient temperature/humidity/air pressure: 10 to 40
°
C, 5 - 85% humidity (non-
condensing, no formation of ice), 86-106 kPa. Class 3k3 per prEN50178.
1.2 Inlet Water Cooling Requirements: 7.6 l/m (2 GPM) @ 690 kPa (100 psi) max, 35
°
C Max.
Heat load: 2KW = 114 BTU/MIN = 6840 BTU/HR
1.3 Coolant type: Water
1.4 Coolant Fittings: Swagelok, 3/8” tube fitting. Tighten per Swagelok specifications using
Swagelok Inspection gauge part# MS-IG-600.
1.5 Inlet Air Requirements: 5-35
°
C max (40-95
°
F). Heat Load: 500W = 29 BTU/MIN = 1750
BTU/HR
2.
Storage and Transportation
1.1 Storage Temperature/Humidity/air pressure: -25 to 70
°
C (class 1k4 per prEN50178), 5 - 95%
humidity (non-condensing, no formation of ice, class 1k3), 70-106 kPa (class 1k4).
1.2 Transport Temperature/Humidity/air pressure: -25 to 70
°
C, 5 - 95% humidity, 70-106 kPa
(class 2k3).
3. This equipment has been designed to be compliant wit h FCC Part 18 emission standards for EMI/RFI
radiation. Radiated emissions shall also not exceed maximum levels permitted by ANSI C95.1-1982
standards on safety levels with respect to human exposure to RF and electromagnetic fields from
300KHz to 100GHz.
D. Testing Specifications
1.
Production Acceptance Test: Each unit will be required to "pass" production acceptance testing and a
"Final Test Report" will be generated to document results.
1.1 Production Acceptance Testing process shall include as a minimum: Complete