INSTRUCTIONS FOR TECHNICAL PERSONNEL
29
INSTALLATION
1)During installation, carry out proper machine levelling, which is a
prerequisite for a correct operation thereof (max. tolerance 2°).
In order to prevent any damage caused by steam going out of the machine,
make sure that the surrounding materials do not deteriorate in its presence.
After machine installation check thermostat settings, booster 85°C, tank 60°C.
2)ELECTRICAL CONNECTION
The electrical safety of this equipment is only assured if it is connected as
follows.
It is necessary to connect the equipment to an effective earthing as specified
by the electrical safety regulations in force. Check that this basic requirement
is complied with, in case of any doubt ask for a careful check of the
installation by a qualified personnel.
In the case the earthing is not efficient there will be a dispersion due to the
suppresser.
The machine shall be included in a correctly dimensioned equipotential, whose
effectiveness is to be very tight in accordance to the procedures set for in the
applicable safety standards. The connection shall be performed through a
screw marked by a plate
near the rear side of the appliance.
The manufacturer declines any responsibility for any damages caused by lack
of an effective ground installation.
For the electrical connection, hook-up, have available a wall circuit breaker
switch with multiple phase (see following list) with contact aperture distance,
equal to or not exceeding 3mm and a supply cable no less than 2.5mm².
Model
220/230V
∼
220/230V3
∼
380/400V 3N
∼
FC54-E
FC54-EA
20A
20A
20A
For other supplies the cable cross section must be calculated according to
voltage and length of cabling. If cabling too long adjust cable size to Amp
rating; do not pull on supply cable or install it under tension. If cable needs to
be replaced use type H07RN-F.