InteliMains
NT
, SW version 3.0
InteliMains-NT-BTB-3.0-Reference Guide.pdf,
©ComAp – June 2013
155
parallel operation with the mains.
N
OTE
:
# sign in the name of this setpoint marks that this setpoint is shared among
all controllers connected by CAN2 bus.
12.2.8.5
Setpoint: #SysAMFstopDel
Group
Pwr management
Range [units]
0 .. 600 [s]
Related FW
3.0
Description
System stop delay between input
Sys start/stop
opening and Power
Management System deactivation. When input
Sys start/stop
is controlled by
mains decoupling relay, this is a delay among the end of mains failure and
opening of GCB. If the MCB feedback is closed, gen-sets are unloaded to
mains prior to GCB opening.
N
OTE
:
# sign in the name of this setpoint marks that this setpoint is shared among
all controllers connected by CAN2 bus.
12.2.8.6
Setpoint: #LoadResStrt 1
Group
Pwr Management
Range [units]
-32000 ..
Related FW
3.0
Description
This setpoint is used to adjust the load reserve for start in absolute mode. i.e.
= ABS (kW) or ABS (kVA) if the reserve set #1 is active.
Learn more about reserves in the chapter
Reserves, minimal running power
.
The currently active reserve set is selected by binary inputs
. If none of these inputs is active the set #1 is selected.
N
OTE
:
If the absolute power management is selected, this setpoint (or the setpoints
reserve set is selected) determines also the number of gensets (that are part
of the power management) which will start (according to their priority and
nominal power).
N
OTE
:
There is a possiblity to assign this setpoint negative number. This can be
used in some situations to allow genset start after Sys Start/Stop gets active.