Page 20 of 28
INSTRUCTION MANUAL
LI-3P-1x Series
3-PHASE LINE IMPEDANCE STABILIZATION NETWORKS (LISNs)
SECTI ON 4 -
PRODUCT APPLICATION
1912 1 E l T o ro R d
●
Si l vera do, Ca lifo rni a 9 26 76
●
(9 49) 459 -96 00
●
co m-p o wer. com
REV083017
FIGURE 9 -
Wiring Instructions for EUT Power Port Plug
(63/100 Amp)
LIFT CONNECTOR
LIFT CONNECTOR
FROM HOUSING
FROM HOUSING
AND THREAD
AND THREAD
WIRING THROUGH
WIRING THROUGH
STRAIN RELIEF
STRAIN RELIEF
AND CONNECTOR
AND CONNECTOR
HOUSING.
HOUSING.
ROTATE STRAIN
ROTATE STRAIN
RELIEF
RELIEF
COUNTER-
COUNTER-
CLOCKWISE
CLOCKWISE
TO LOOSEN
TO LOOSEN
UNSCREW THE
UNSCREW THE
FOUR SCREWS
FOUR SCREWS
WHICH SECURE
WHICH SECURE
THE CONNECTOR
THE CONNECTOR
TO THE
TO THE
CONNECTOR
CONNECTOR
HOUSING
HOUSING
LOOSEN THE
LOOSEN THE
SCREWS FOR THE
SCREWS FOR THE
RESPECTIVE WIRE
RESPECTIVE WIRE
TRAPS; INSERT
TRAPS; INSERT
STRIPPED WIRE
STRIPPED WIRE
ENDS INTO THE
ENDS INTO THE
APPROPRIATE,
APPROPRIATE,
RESPECTIVE WIRE
RESPECTIVE WIRE
TRAPS AND
TRAPS AND
RE-TIGHTEN SCREWS
RE-TIGHTEN SCREWS
RE-INSERT
RE-INSERT
CONNECTOR
CONNECTOR
INTO
INTO
CONNECTOR
CONNECTOR
HOUSING
HOUSING
TIGHTEN THE
TIGHTEN THE
FOUR SCREWS
FOUR SCREWS
WHICH SECURE
WHICH SECURE
THE CONNECTOR
THE CONNECTOR
TO THE CONNECTOR
TO THE CONNECTOR
HOUSING AND
HOUSING AND
RE-TIGHTEN STRAIN
RE-TIGHTEN STRAIN
RELIEF BY ROTATING
RELIEF BY ROTATING
CLOCKWISE UNTIL
CLOCKWISE UNTIL
TIGHTENED
TIGHTENED
STEP #3
STEP #3
STEP #1
STEP #1
STEP #2
STEP #2
STEP #4
STEP #4
STEP #5
STEP #5
STEP #6
STEP #6