Install the plate assembly in the boiler, evenly spaced as possible. Set the yoke over the
bolt, install the nut and make it hand tight to keep the plate from moving.
Using the correct size socket wrench, tighten the nut one quarter turn. See Figure 7. If the
gasket leaks while the pressure is being brought up on the boiler, tighten the nut only
enough to stop leaking. See Figure 8.
Check the gaskets for leakage for the next three days after installation and if leakage is
detected tighten only enough to stop it.
WARNING: EXCESSIVE TIGHTENING WILL FLATTEN OUT THE GASKETS TO A POINT
WHERE THEY WILL NO LONGER BE ABLE TO SEAL. DO NOT TIGHTEN MORE
THAN IS REQUIRED TO SEAL
IMPROPER PRESSURE ON GASKET OF HANDHOLE PLATE
Figure 8
Cleaning the Flue Passages
Under normal operating conditions the flue passages do not need to be cleaned. If poor
combustion has been experienced and soot has built up on the flue passages they can be
cleaned following this procedure. Before cleaning have your boiler technician check the
stack temperature and combustion efficiency to make sure that cleaning is necessary.
Do not disassemble the jacket top ring without first obtaining a millboard top gasket.
This
gasket can become brittle over time and will be impossible to reinstall after removing. This
can cause combustion gasses to leak and can cause a dangerous situation. If your boiler
was built after February 1991 you will
also need
an upper hand hole gasket, part number
480210.
Summary of Contents for CT Series
Page 2: ...CT BOILER WITH PARTIAL SECTION Figure 1 ...
Page 13: ...FM 148 COLUMBIA BOILER COMPANY REV 6 06 10 Figure 4 BLOWDOWN PIPING ...
Page 34: ...FM 148 COLUMBIA BOILER COMPANY REV 6 06 31 MAINTENANCE LOG ...
Page 35: ...FM 148 COLUMBIA BOILER COMPANY REV 6 06 32 MAINTENANCE LOG ...
Page 48: ...APPENDICES ...
Page 58: ......
Page 60: ...OPERATION OF WARRICK DUAL FUNCTION CONTROLS 5 95 PRINTED IN U S A ...
Page 61: ...INSTALLATION OF WARRICK SERIES 3C 3K ELECTRODE FITTINGS ...
Page 62: ......
Page 63: ...OPERATION OF WARRICK SERIES 26 CONTROLS 5 93 ...
Page 64: ......
Page 65: ......
Page 66: ......
Page 67: ......
Page 68: ......
Page 69: ......
Page 71: ......