FM-148 COLUMBIA BOILER COMPANY, REV 6-06
- 37 -
3. Start the burner. After the prepurge is complete, the pilot will light and indicate
between 1-1/2 and 4 microamps. The main gas valve should try to open and
indicate power between terminals MV-MV.
4. Reduce the size of the pilot flame to the turndown position by slowly closing the
manual valve on the pilot gas line. At the turndown condition, the pilot will be
small enough so it just barely causes the main gas valve to open (about 1 to 1-
1/2 microamps.).
a. slowly turn down the pilot until the main gas valve will not open and the burn-
er shuts down on flame failure.
NOTE: The burner motor will continue to run.
b. Allow the burner to complete prepurge. If the control locked out, reset the
control by depressing the reset switch for sixty seconds and restart the burn-
er.
c. As the control attempts to restart the pilot, turn the pilot back up slowly until
the gas valve tries to open.
d. Again turn the pilot down slightly but not enough so the flame drops out. If
the relay drops out simply repeat step c above. If the control locks out allow
the safety switch to cool, reset the switch, and repeat step c.
5. Check that the pilot is lit and the gas valve is trying to open.
6. Open the manual main burner gas cock. Main flame should light within one sec-
ond.
If the burner does not light within one second, close the shutoff cock and
shut off power to the relay.
Proceed to step 8.
7. If the burner lights, repeat step 6 a number of times to verify the light off.
Proceed to step 10.
8. If the light off is unsatisfactory, readjust the flame detector to require a larger
pilot flame to cause the main gas valve to open.
a. Adjusting the flame rod detector so that a larger minimum pilot flame is
required by moving the flame rod farther from the grounding rods.
9. repeat the entire turndown test until the flame is established promptly in step
number 6.
10.
Turn the pilot up to full flame
at the completion of the test.
Summary of Contents for CT Series
Page 2: ...CT BOILER WITH PARTIAL SECTION Figure 1 ...
Page 13: ...FM 148 COLUMBIA BOILER COMPANY REV 6 06 10 Figure 4 BLOWDOWN PIPING ...
Page 34: ...FM 148 COLUMBIA BOILER COMPANY REV 6 06 31 MAINTENANCE LOG ...
Page 35: ...FM 148 COLUMBIA BOILER COMPANY REV 6 06 32 MAINTENANCE LOG ...
Page 48: ...APPENDICES ...
Page 58: ......
Page 60: ...OPERATION OF WARRICK DUAL FUNCTION CONTROLS 5 95 PRINTED IN U S A ...
Page 61: ...INSTALLATION OF WARRICK SERIES 3C 3K ELECTRODE FITTINGS ...
Page 62: ......
Page 63: ...OPERATION OF WARRICK SERIES 26 CONTROLS 5 93 ...
Page 64: ......
Page 65: ......
Page 66: ......
Page 67: ......
Page 68: ......
Page 69: ......
Page 71: ......