
COLUMBIA BOILER COMPANY, REV 2-17
- 22 -
MAINTENANCE
RECORD KEEPING
All manufacturers’ literature, spare parts lists, operating and maintenance procedures
should be maintained in the boiler room at all times. A log book should also be provided
to record maintenance work, inspections, and other performance test results.
General
Clean the boiler and heating surfaces whenever required. The frequency of the cleaning
required to maintain the boiler at peak efficiency will be determined only by frequent
inspections. It cannot be predicted. Your operating conditions might be different from your
neighbors. When in doubt - check it out.
DISCONNECT ALL INCOMING ELECTRICAL POWER BEFORE SERVICING THE
BOILER. USE EXTREME CAUTION AROUND BOILER PIPING AND THE WAR-
RICK SERIES DF LOW WATER CUT OFF SINCE THEY MAY BE VERY HOT.
The life of your boiler will be determined by the level of care given it by those who are
responsible for maintenance. A log of the following items should be maintained in the boil-
er room at all times.
Daily Boiler Check & Maintenance List
1. Water Level Controls and Cut Offs are operating normally.
2. Instrument and equipment settings are normal.
3. Gauge glass is clean and protector is installed. If leaks are detected, replace glass,
gaskets, and brass washers immediately. When replacing gauge glass use only
5/8" O.D. x 10-1/4" long Pyrex red line, high pressure, high temperature, glass
tubing, with fire polished ends. See gauge glass maintenance section for proper
method when installing this gauge glass.
4. Boiler water at proper operating level.
5. Blow down boiler as instructed under BLOWDOWN.
6. Blow down probe type low water cutoff.
Weekly Boiler check & Maintenance List
1. Check flame failure detection system.
A. Gas boilers: Close fuel supply to pilot and main gas and check shut down
timing.
B. Oil boilers: Remove cad cell leads and check shut down timing.
2. Check fuel valves. Open limit switch and make aural and visual check.
3. Check ignition system flame signal.
WARNING
Summary of Contents for CT-10
Page 14: ... COLUMBIA BOILER COMPANY REV 2 17 11 Figure 4 BLOWDOWN PIPING ...
Page 31: ... COLUMBIA BOILER COMPANY REV 2 17 28 MAINTENANCE LOG ...
Page 32: ... COLUMBIA BOILER COMPANY REV 2 17 29 MAINTENANCE LOG ...
Page 43: ...APPENDICES ...
Page 44: ......
Page 48: ......
Page 49: ......
Page 51: ......
Page 52: ......
Page 54: ......
Page 55: ......