
COLUMBIA BOILER COMPANY, REV 2-17
- 9 -
FEEDWATER PIPING
Figure 2
Do not fill the boiler
until the installation is complete and you are ready to fire the burner.
Firing the burner will then boil the water which will drive off the dissolved oxygen in the
water and help maintain the proper boiler water chemical balance.
See the WATER TREATMENT section for important information regarding the proper chem-
ical water treatment required to insure satisfactory service life of the boiler.
On long horizontal runs of piping, it is best to maintain the piping as level as possible.
Avoid high spots that will collect air and lead to erratic pumping. Install a check valve to
prevent the boiler water from back feeding into the service water supply.
STEAM PIPING
Figure 3
EQUIPMENT
REQUIRING
STEAM
Summary of Contents for CT-10
Page 14: ... COLUMBIA BOILER COMPANY REV 2 17 11 Figure 4 BLOWDOWN PIPING ...
Page 31: ... COLUMBIA BOILER COMPANY REV 2 17 28 MAINTENANCE LOG ...
Page 32: ... COLUMBIA BOILER COMPANY REV 2 17 29 MAINTENANCE LOG ...
Page 43: ...APPENDICES ...
Page 44: ......
Page 48: ......
Page 49: ......
Page 51: ......
Page 52: ......
Page 54: ......
Page 55: ......