![Colibri SMARTHUB User Manual Download Page 8](http://html1.mh-extra.com/html/colibri/smarthub/smarthub_user-manual_2637138008.webp)
8
SMARTHUB
2.
INSTALLATION
The SMARTHUB unit connects with all common PLC I/O ports and takes up only a
small area for mounting in the CNC machine. It requires minimal mechanical
installation.
.
2.1.
System Requirements
•
24V (AC/DC) xxx [mA] max power feed line
•
5 x I/O port types
•
Mounting placement: Stationary position with direct, unobstructed Wi-Fi access
to the machine spindle sensor
•
Mounting holes according to mechanical mounting layout schematic
•
Display Tablet charging: Standard 220/110 50Hz socket
2.2.
Mechanical Installation
•
SmartHUB should be mounted inside the machine workpiece processing cabinet.
•
The back side of SMARTHUB unit has 4 standard M5 threads to interface with a
mounting bracket (not supplied), or cabinet wall.
•
For the maximum RF performance, it is recommended to install the SMARTHUB
on the back wall of the processing cabinet, with logo facing outwards.
•
SMARTHUB should be installed in a vertical position with connector facing
downwards.
•
Although designed to flush excessive coolant in a 90
o
vertical position, it is
recommended to install at a slight tilt (5-25 degrees) facing downwards, to rush
coolant and chip evacuation when needed.
•
SMARTHUB unit includes a 1 meter cable with male connectors at both ends:
Amphenol 12-08PMMS-SF8001.
IN
STAL
LATI
ON