3-2
B/T
®
RAPID-LOAD
®
Peristaltic Pumps and Drive Operating Manual
Cole-Parmer
Section 3
Operation
A)
EXTERNAL RECEPTACLE
B)
MOTOR RECEPTACLE
C)
LINE CORD
D)
INTERLOCK CONNECTOR
E)
T8A FUSE (115V AC); T4A FUSE (230V AC)
F)
POWER SWITCH — ALL SETTINGS ARE RETAINED IN MEMORY
Figure 3-2.
Connectors and Switch on Controller Side Panel
1. Connect Motor Cable plug to mating receptacle on the Controller.
2. Connect Interlock Cable plug to mating receptacle on the controller.
3. Connect power cord of Controller to grounded power line outlet.
4. Turn controller on and select TUBING SIZE.
NOTE:
If CAL LED is lit, that tubing size has been previously field
calibrated. If LED is not lit, the drive is operating with the built-in factory
calibration. To clear a field calibration, press and hold the CAL switch
until the CAL light goes out. This will take about 3 seconds. To recalibrate
for better accuracy, see Calibration section.
5. MODE selection (INT, mA, V).
6. Select MOTOR DIRECTION (CW or CCW).
7. PRIME and CALibrate the pump (if required).
8. Press FLOW key and watch display to set the flow rate with
UP/DOWN keys.
9. Press STOP/START key to begin pumping.
NOTE:
Under some circumstances, tubing may creep into pump. If this
problem occurs it can be remedied by installing a hose clamp or fitting
immediately upstream of and very close to the inlet port.
NOTE:
Pump will restart automatically after a brownout or powerout condition.
Section 3
Operation
Controller Setup
A
B
C
D
E
F