CQube
SE20 BARISTA
11
INSTALLATION AND START-UP
Connecting CQube SE to BARISTA module
Guide the milk tube from the outlet beam
through the holes in side panel of the machine
and barista unit. Connect it to the mixer bowl.
Assemble the top lid by pressing the guide pins
into the profiles.
Connect the power cords (G,H) and water inlet
hose (F) as figure.
Slide the front and back profiles in the middle
of these two machine (E), push the profiles all
the way down.
02
04
03
05
G
G
F
E
E
H
Summary of Contents for CQube SE20
Page 1: ...CQUBE SE20 BARISTA USER MANUAL UM_EN Part No 1764020_02 ...
Page 42: ......
Page 43: ......