![Cobra Helicopter Goblin 500 Manual Download Page 24](http://html1.mh-extra.com/html/cobra-helicopter/goblin-500/goblin-500_manual_2631413024.webp)
1
2
3
4
FBL Assembly
Double- sided Tape
FBL support
(H0250-S)
Socket Head Cap M2.5x6mm
(HC018-S)
Finishing Washer
M2.5
(H0255-S)
FBL System Installation
We recommend the use of a one unit flybarless system, i.e. Mini vBar, Microbeast, etc. However, a two unit flybarless system can
also be installed. For one unit systems, the unit is installed as shown in position 1 (Fig 1)
Two unit systems can be installed as follows: control unit in position 1 and sensor in position 2 or vice-versa. (Fig 1). See Fig 2, 3 & 4.
Position 3 and 4 can be used for a Spektrum sattelite. (Fig 1)
FBL
Copyright@2013 - SAB Heli Division - All rights reserved
Page 22
Chapter 13, Installation of FBL System
Summary of Contents for Goblin 500
Page 1: ......
Page 13: ...6 Main Rotor Copyright 2013 SAB Heli Division All rights reserved Page 11 Chapter 6 Head ...
Page 15: ......
Page 39: ......
Page 40: ......