
RAISE THE TOWER
17. Once all sensors are attached and the wires are secured to the
tower, slowly raise the tower. While one person steadies the
tower, insert the final bolts in the third tower leg and secure.
FINISH WIRING
18. Run all cables through the gasket feedthroughs and attach to
the ZENO
®
as shown in the wiring diagram. Tighten gasket
feedthroughs by hand.
820 First Avenue South, Seattle, WA 98134 Tel: +1 (800) 488-8291 / +1 (206) 682-6048 Fax: +1 (206) 682-5658 www.CoastalEnvironmental.com
18a
18b
17d
17c
17b
17a
ZENO
®
Permanent Weather Station Set-Up Guide
4
7