sliding the box onto the two screws that are backed out. Lower the box so the 
connectors mate together and screw into place with the 1/4-20 hex bolts. **Note-
Be sure the gray foam gaskets are securely in place around the black connectors 
on the back of the tower. 

13)  Remove the top back panel on the upper section. 

14)  Install lamps and lenses on the Top Sign. The lenses need to be installed with 

Red on the outer most row and then work into the orange, yellow, green, blue 
and violet. Repeat as needed until reaching the center lamp with a clear 
lens. **NOTE - The Center Lamp will be a repeating strobe and NOT a 60volt 
lamp. 

15)  Slide Top Sign pole into the upper tower section and remove the back panel of 

the Top Sign. Then run the wires through the hole in the tower section. 

16)  Connect all of the mating Molex connectors and reinstall the back panel on the 

tower section. 

17)  Bolt the Top Sign onto the tower section using the hardware provided and BOTH 

black gaskets. Re-install the back panel on the Top Sign. 

18)  Install the guy wire cables. The longest ones go to the upper section and the 

shorter ones go to the lower section. For a 45' game there will be 3 different 
lengths and 3 guy wire attachment points on the tower. 

19)  Install the 'Pull Up' cable to the same stud as the guy wire cable on the BACK of 

the upper tower section. Remember when installing the guy wire cables Do Not 
over tighten them. They should be snug, but the cable should be able to freely 
move back and forth. 

20)  Test the tower. Things to check are: 

  Sound 

  LED boards 

  Strobe Boards for Proper tower height 

  Top Sign lamps and strobe 

  Skill Select operation 

  Bolts between tower sections are secure 

  Weatherproofing on Lexan and between tower section and Top Sign 

  All back panels are overlapping 

  LED gaskets are securely in place 

  Guy wires are secure 

  Top Sign bolted into place and back panel re-installed 

  Striker 

 

21)  Using a crane, lift the complete tower and lower it onto the studs mounted into 

the concrete. 

Summary of Contents for Hi-Striker X-treme

Page 1: ...he black gasket on either side of the LED board to expose the screws Once the tower sections are close enough plug the upper LED board of the lower section into the LED board on the upper section short cable w red connector 6 Reinstall LED board screws and secure LED gasket back into place 7 Bolt the tower sections together using the 4 3 8 x 1 hardware included in the hardware kit 8 Once the tower...

Page 2: ...ign onto the tower section using the hardware provided and BOTH black gaskets Re install the back panel on the Top Sign 18 Install the guy wire cables The longest ones go to the upper section and the shorter ones go to the lower section For a 45 game there will be 3 different lengths and 3 guy wire attachment points on the tower 19 Install the Pull Up cable to the same stud as the guy wire cable o...

Page 3: ...ritical weatherproofing step Tools Needed for Hi Striker X Treme 7 8 open box end wrench Tower Base Hardware 3 4 open box end wrench Skill Select Mounting Hardware 9 16 open box end wrench Guy wire Bracket Hardware 7 16 open box end wrench PCB Enclosure 3 8 drive ratchet 7 8 socket Pocket Top Sign Bolts 3 4 socket Packing hardware 9 16 socket Guy wire hardware 1 2 socket New Style Park Guy wire Cl...

Page 4: ...n experienced operator is required Cherry Picker 30 35 reach to lift a person up to the back of the tower to disconnect the crane from its attachment points Fencing To securely enclose the Hi Striker play field before operation Labor Please have adequate staff to help with the basic assembly and to erect the tower Power Please have the required power 220v 20amp run to the location Also temporary p...