COMPOST BIN ASSEMBLY
(continued)
STEP 6.
ATTACH THE TOP SLATS
5.1 Position the Base Trim Side (6) as shown and secure with 3" Deck Screws.
5.2 lnstall the Base Trim Rear (7) as shown and secure with 3" Deck Screws.
5.3 Secure the Base Trim Front (8) as shown with 3" Deck Screws.
5
2” Deck Screws - 24
3/4” Projection
Ends are flush
3" Deck Screws - 10
6.1 Working down from the top of the frame assembly, attach the Side
Slats (9) to the frame assembly as shown.
6.2 Attach the Front Slat (10) and Rear Slat (11) to the frame assembly
as shown.
6.3 Secure all slats with 2" Deck Screws.
STEP 5.
TRIM THE BASE
NOTE:
• The top slats should project 3/4" above
the top of the frame assembly.
• The side slats are installed first. The ends
should sit flush with the back and front
of the frame assembly.